# Addtape: Change Orders — Price, sign and bill extras

> Price, sign and bill extras (iPhone/iPad app by Elias Ali.)

- Source: https://appshunter.io/ios/app/addtape-change-orders/id6829983307 (this page in markdown: same URL + `.md`)
- Developer: [Elias Ali](https://appshunter.io/developer/1789955961)
- Category: Business, Productivity
- Price: Free with in-app purchases
- Age rating: 4+
- Requires: iOS 18.0 · 5 MB
- Languages: American English
- Released: 2026-11-06
- Data updated: 2026-11-10

## What is Addtape?

Addtape keeps a running tab for each job: the original contract plus every extra the homeowner asks for on site. Each extra is priced and signed before the work starts, and the final invoice can't be made while an extra is left unsettled.

THE JOB TAB
• See the original contract, the signed changes and the contract total now, at a glance.
• Unsigned extras stay on the tab until you settle them, so none slip past the invoice.

ADD AN EXTRA ON SITE
• Take a photo, type what changed and enter the amount. Schedule and payment effect default to "No change".
• Mark small favors as no charge, so they're on record too.

THE CLIENT SIGNS ON YOUR IPHONE
• The signing screen shows the change and the contract total, was and now.
• The client signs with a finger and types a name, then you sign as the contractor.
• Give the client a copy: print it or send a PDF. Sending asks for the client's consent to an electronic copy first.

SIGNED, NUMBERED, LOCKED
• Every signed change order gets a number and is locked. It can't be edited.
• Tap Verify to recompute its fingerprint and check that nothing changed.
• A fix makes a new change order that supersedes the old one, and a void needs a reason. The history stays.

FINAL INVOICE FROM THE TAB
• Before the invoice is made, Addtape lists any unsigned extras and asks you to decide on each one.
• The invoice lists each change order by number. Print it, send it as a PDF or export a CSV.
• Log client payments by hand to keep the balance up to date.

OPTIONAL: TEXT AND EMAIL APPROVALS
• Off by default. Turn it on in Settings to mark an unsigned extra as approved by text or email, with screenshots. It is always labelled "Approved by text, not signed".

NO ACCOUNT, WORKS WITH NO SIGNAL
• No account, no server, no ads and no analytics.
• Your records stay on your iPhone. If iCloud Drive is on, Addtape also saves a backup to its own folder in your iCloud Drive and offers to restore it on a new iPhone.

PRICING
• Your first job is free, from the first extra to the final invoice. The sample job doesn't count.
• Starting another job needs Addtape Pro, a one-time in-app purchase. No subscription.

Addtape is a record-keeping tool. It doesn't give legal advice and doesn't process payments.

## Pricing and in-app purchases

Base price: Free.

**One-time purchases**

| Purchase | Price | Type |
| --- | --- | --- |
| Addtape Pro | $7.99 | one-time |


## Is Addtape safe?

Not enough ratings yet to assess Addtape.

## Is Addtape legit?

Addtape: Change Orders appears legitimate, with a few gaps. The AppsHunter Legitimacy Score for Addtape is 65 out of 100 points across 7 verification signals from App Store and developer data.


## Version history (last 2 releases)

### 1.1 — 2026-11-10

More of your job paperwork, in one place:

• Create proposals with photos, quantity-based prices, terms and PDF copies. Record acceptance and turn an accepted proposal into a job.
• Reuse saved clients and priced items. Search your items, add one while drafting, or use a quick price shortcut.
• See proposals awaiting approval, active jobs and outstanding invoices on the new Home screen.
• Add invoice due dates and payment terms, prepare payment follow-ups, and set optional reminders for yourself.
• Review an optional checklist for costs you might have missed before finishing a proposal.
• Find keyboard dictation guidance, clearer line totals and easier controls at larger text sizes.
• A cleaner construction-inspired design, with original jobsite illustrations, tool icons and subtle motion that respects Reduce Motion.

### 1.0 — 2026-11-06

No release notes.

## More apps by Elias Ali

- [Sneeze Cough Recorder](https://appshunter.io/ios/app/sneeze-cough-recorder/id6740434199)
- [VersoScan: PDF Translator](https://appshunter.io/ios/app/versoscan-pdf-translator/id6821770780)
- [Stillfern: Focus Timer](https://appshunter.io/ios/app/stillfern-focus-timer/id6828071436)

All apps by Elias Ali: https://appshunter.io/developer/1789955961

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-11-10.*
