# BuildSlip: Change Orders — T&M Tickets & Signed PDFs

> T&M Tickets & Signed PDFs (iPhone/iPad app by Ahmet Cagri Simsek.)

- Source: https://appshunter.io/ios/app/buildslip-change-orders/id6808585127 (this page in markdown: same URL + `.md`)
- Developer: [Ahmet Cagri Simsek](https://appshunter.io/developer/6797597477)
- Category: Business, Productivity
- Price: Free with in-app purchases
- Age rating: 4+
- Requires: iOS 18.0 · 2 MB
- Languages: American English
- Released: 2026-09-14
- Data updated: 2026-10-04
- User reviews in markdown: https://appshunter.io/ios/app/buildslip-change-orders/id6808585127/reviews.md

## What is BuildSlip?

Turn extra work into a signed change-order record before you leave the jobsite. Capture labor, materials, photos and an on-site signature, then share a clear PDF. Create the record even without a signal.

Built for independent contractors and small electrical, plumbing, HVAC and remodeling crews who need a focused field-record tool, without a complicated project-management setup or a separate BuildSlip account.

CAPTURE THE WORK
- Describe the requested change and choose the project.
- Itemize labor, materials and equipment, with quantities, rates and markup.
- Attach jobsite photos, captions and markup.
- Keep a daily log when you need to document progress.

GET THE APPROVAL
- Review the scope and total with the customer or site representative.
- Collect an electronic signature on your iPhone or iPad.
- Attach and clearly label written approval evidence when appropriate.
- Preserve the signed original; corrections become a separate revision.

SEND A CLEAR RECORD
- Preview a Letter-size PDF with costs, evidence and approval.
- Prepare a customer message and signed PDF for your chosen sharing app.
- Copy a concise invoice note without retyping job details.
- Track submitted, approved, rejected, invoiced and paid status yourself.

WORK OFFLINE. KEEP YOUR DATA.
Local records remain available offline. Private iCloud sync works through your Apple iCloud account when available. Sync and network delivery require an internet connection. Export or import a complete portable ZIP backup.

Repeat work is faster with reusable catalog items and duplicate-as-new-draft. Old signatures, photos and approval evidence are not copied into the new ticket. Signed snapshots and PDFs include integrity hashes and verification codes.

FREE TO START
Your first three signed exports are free; this is not a monthly allowance. BuildSlip Pro unlocks unlimited signed records and PDFs, your company logo on new PDFs and removal of the BuildSlip footer. Revision history and complete ZIP backup remain available without Pro. Existing records stay readable and exportable when a subscription ends.

Choose an auto-renewing Annual subscription or a one-time Lifetime purchase. Annual renews yearly unless canceled in your App Store subscription settings. Prices and any eligible offers are shown before purchase. Restore eligible purchases from Settings.

BuildSlip creates field records, not accounting invoices. It does not collect construction payments, automatically confirm payment, provide legal advice or guarantee enforceability. On-site signature capture is not a remote-signing service.

Terms of Use: https://www.apple.com/legal/internet-services/itunes/dev/stdeula/
Privacy Policy: https://buildslip.com/privacy

## Pricing and in-app purchases

Base price: Free.

**Subscriptions**

| Subscription | Price | Period |
| --- | --- | --- |
| BuildSlip Pro Annual | $59.99 | per year |

**One-time purchases**

| Purchase | Price | Type |
| --- | --- | --- |
| BuildSlip Pro Lifetime | $99.99 | one-time |



## Version history (last 4 releases)

### 1.0.3 — 2026-09-30

Company profiles now show a clear save confirmation.
Improved company name and logo selection after restoring or syncing your records, including on new signed PDFs.
Clearer Annual and Lifetime purchase buttons, with improved dark-mode contrast and large-text support.
Existing records and signed PDFs remain unchanged.

### 1.0.2 — 2026-09-18

Rate BuildSlip from Settings > Help & legal.

Small improvements to sharing signed PDFs. Existing records, signed PDFs and Pro purchases remain available.

### 1.0.1 — 2026-09-16

Fixed an issue where opening photo markup or changing an approval label could remove a photo from an unsaved draft.

Signed PDFs now open in a full-screen preview for easier reading on iPhone and iPad.

Clarified how cost information is stored locally, synced through your private iCloud account, and shared when you export a PDF or backup.

Existing records, signed PDFs and Pro purchases remain available.

### 1.0 — 2026-09-15

No release notes.

## More apps by Ahmet Cagri Simsek

- [Driving Log: Teen Permit Hours](https://appshunter.io/ios/app/driving-log-teen-permit-hours/id6797597475)
- [LogSet](https://appshunter.io/ios/app/logset/id6803869751)

All apps by Ahmet Cagri Simsek: https://appshunter.io/developer/6797597477

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-10-04.*
