# Change Order Form: T&M Ticket — Sign extra work on site, PDF

> Sign extra work on site, PDF (iPhone/iPad app by Matvii Kaushynskyi.)

- Source: https://appshunter.io/ios/app/change-order-form-t-and-m-ticket/id6798168076 (this page in markdown: same URL + `.md`)
- Developer: [Matvii Kaushynskyi](https://appshunter.io/developer/6783954167)
- Category: Business, Productivity
- Price: Free with in-app purchases
- Age rating: 4+
- Requires: iOS 17.0 · 1 MB
- Languages: American English
- Released: 2026-09-10
- Data updated: 2026-10-15

## What is Change Order Form?

Get paid for the work nobody wrote down.

Extra work starts with someone on site saying "just do it, we'll sort the paperwork later". Months later the paperwork is the argument. ChangeProof turns that moment into a priced, signed PDF before you leave the job.

SIXTY SECONDS, ON SITE
• Describe the extra work and why it sits outside the contract
• Name the person who authorized it — the field that decides who pays
• Add labor: who, what trade, hours, rate, overtime as its own line
• Add materials and equipment, with markup if your contract allows it
• Attach photos of what you actually did
• Get the client or superintendent to sign on the screen
• Export one PDF and send it

THE TOTAL IS THE POINT
Every line adds up as you type it, so the amount is on screen while the person who approved the work is still standing next to you. No spreadsheet afterwards, no rebuilding it from memory on Sunday night.

BUILT FOR THE FIELD
• Works fully offline — no signal needed
• No account, no login
• Your first tag is free
• Tags stay on your iPhone
• Sequential tag numbers, so you can point to T-014 and everyone knows which one

WHY THIS DOCUMENT MATTERS
Two thirds of specialty contractors still write time and materials on paper tags. Those tags get lost, and the work gets written off. A tag with the labor priced, the photos attached and both signatures on it is a different conversation with the general contractor — one you can send the same day.

PRICING
ChangeProof is free to download, and your first PDF export is free. After that, choose one of:
• Single PDF Export — one PDF export, one-time purchase
• 5 Tag Pack — five PDF exports, one-time purchase; credits never expire
• Lifetime Unlimited — unlimited exports, one-time purchase, no subscription
• Monthly Unlimited — unlimited exports, an auto-renewable subscription billed every month
Prices for your country are shown in the app before you buy (US: $9.99, $19.99, $49.99 and $9.99 per month).
Monthly Unlimited is charged to your Apple Account at confirmation of purchase and renews automatically each month unless it is canceled at least 24 hours before the end of the current period. Your account is charged for renewal within 24 hours before the period ends. Manage or cancel the subscription in Settings > Apple Account > Subscriptions.

ChangeProof is documentation software. It is not legal, contractual, or accounting advice. Read your contract before relying on any record.

Terms of Use (EULA): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/
Privacy Policy: https://depositproof-reports.vercel.app/changeproof-privacy

## Pricing and in-app purchases

Base price: Free.

**Subscriptions**

| Subscription | Price | Period |
| --- | --- | --- |
| Monthly Unlimited | $9.99 | per month |

**One-time purchases**

| Purchase | Price | Type |
| --- | --- | --- |
| Single PDF Export | $9.99 | one-time |
| 5 Tag Pack | $19.99 | one-time |
| Lifetime Unlimited | $49.99 | one-time |


## Is Change Order Form safe?

Not enough ratings yet to assess Change Order Form.

## Is Change Order Form legit?

Change Order Form: T&M Ticket appears legitimate, with a few gaps. The AppsHunter Legitimacy Score for Change Order Form is 65 out of 100 points across 7 verification signals from App Store and developer data.


## Version history (last 5 releases)

### 1.1.4 — 2026-10-09

A clearer name in the App Store: Change Order Form: T&M Ticket. The app works exactly as before — your tags, prices and signatures stay as they are.

### 1.1.3 — 2026-10-07

PDF tags now come out right in dark mode. Before, a tag exported while your iPhone was in dark mode could show titles, amounts and notes in white on the white page. Every PDF now prints dark text on white paper, whatever your display settings.

### 1.1.2 — 2026-10-06

Your change orders are safer. If the app ever can't open your saved change orders, it now keeps the file exactly as it was, tells you, and shows how to get it back, instead of starting with an empty list. Change orders you saved in earlier versions keep opening after future updates.

### 1.1.1 — 2026-09-25

Small fixes and polish.

### 1.1 — 2026-09-18

Your first PDF export is free — build a tag, sign it, send it, no purchase needed.

New plans for regular use: a 5-tag pack, a monthly unlimited plan, and a lifetime unlimited purchase, alongside the single export. The paywall now shows your own tag's PDF before you decide.

Also: purchases restore across devices and finish correctly if the app was closed mid-purchase.

## More apps by Matvii Kaushynskyi

- [Burst Photo Cleaner: Keepframe](https://appshunter.io/ios/app/burst-photo-cleaner-keepframe/id6783954165)
- [Rental Inspection: Move In/Out](https://appshunter.io/ios/app/rental-inspection-move-inout/id6786717492)
- [Construction Daily Report App](https://appshunter.io/ios/app/construction-daily-report-app/id6788003363)
- [Contractor Estimate & Invoices](https://appshunter.io/ios/app/contractor-estimate-and-invoices/id6790694350)

All apps by Matvii Kaushynskyi: https://appshunter.io/developer/6783954167

## Related topics

[change order app](https://appshunter.io/ios/topics/change-order-app)

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-10-15.*
