# Critical Path — user reviews

> 2 indexed App Store user reviews of Critical Path by Peter Tsang, rated 3.50/5 from 2 ratings.

- Source: https://appshunter.io/ios/app/critical-path/id1422704139/reviews
- App overview in markdown: https://appshunter.io/ios/app/critical-path/id1422704139.md
- Rating breakdown: 5★ 0 · 4★ 1 · 3★ 1 · 2★ 0 · 1★ 0

## Most critical reviews (2 lowest-rated)

### 3/5 — Good start, but

*2019-09-14, version 1.1*

I wish we could choose to start at 0 instead of 1 as many tests start at 0. Also, the location of the duration is right where ES is usually located so kind of confusing. Then there is the pdf export. The CPM is about 1/40th the size of the pdf sheet. It should be adjusted to take up the whole sheet.

### 4/5 — James Hurt

*2019-08-08, version 1.1*

4 decades ago, As a Professional Engineer, I used to prepare CPM’s by pen & paper and was familiar with concept and quickly was able to begin the CPM for my son’s new residential home construction. 
I did send him the PDF of the in- progress CPM, but I don’t know how to collaborate via Internet and would like to have the YouTube video updated for that ASAP.

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-06-10.*
