# Oracle Primavera Unifier

> Mobile companion for Oracle Primavera Unifier project management. (iPhone/iPad app by Oracle America, Inc..)

- Source: https://appshunter.io/ios/app/oracle-primavera-unifier/id1094474000 (this page in markdown: same URL + `.md`)
- Developer: [Oracle America, Inc.](https://appshunter.io/developer/284793707)
- Category: Business, Productivity
- Price: Free
- Rating: 5.00/5 from 1 App Store ratings · 9 written reviews indexed
- Age rating: 4+
- Requires: iOS 16.0 · 98 MB
- Languages: Korean, Dutch, German (Germany), Russian, European Spanish, Arabic, American English, Italian, Japanese, Chinese (Simplified, China) and 3 more
- Released: 2016-03-31
- Data updated: 2026-09-05
- Monetization: free
- User reviews in markdown: https://appshunter.io/ios/app/oracle-primavera-unifier/id1094474000/reviews.md

## What is Oracle Primavera Unifier?

By installing this app, you agree to the End User License Agreement terms at https://docs.oracle.com/cd/F11146_01/EULA/en/EULA.htm

The Oracle Primavera Unifier mobile app is the perfect companion for Unifier users on the go. Project managers and field users can use the Unifier mobile app to view, update, and collaborate on projects. Users can manage tasks, create business process records, and review documents. While offline, field users can continue to work on their downloaded project data and documents.

Unifier mobile app requires you to have a valid license for Primavera Unifier 16.2 and above. Oracle recommends that you upgrade your Primavera Unifier installation to the latest version to utilize all the features of the mobile app, as some of the recent features are supported only on the latest version of Primavera Unifier.

Features:

▪ Manage your assigned tasks and update task progress anywhere, anytime.
▪ Work on your downloaded company and project data without network connectivity.
▪ Synchronize locally saved changes with the Unifier server, once network connectivity is available.
▪ Create new business process records and add line items.
▪ Attach picture, audio, and video files to a business process record, line item, or task.
▪ Review drawings, pdf and image files etc., associated with business process records or in project documents.
▪ Minimize data entry errors by using QR code, bar codes, auto-population, and formula-calculation in the forms.
▪ Use commonly-used pickers and hyperlink fields when working on the forms.
▪ Access and save commonly-used company or project documents.
▪ Access frequently-used business processes faster by adding them as tiles to the Home screen.
▪ View the geo-location of projects and business process records.
▪ Get notified when tasks are assigned to you, without opening the Unifier mobile app.

Additional Information

▪ Oracle recommends that you always synchronize your locally saved changes with the Unifier server before upgrading to the latest version of the mobile app.
▪ The Unifier mobile app for iOS supports Apple OS version 12.0 and above.
▪ The app includes a demo mode that enables you to evaluate the app without a license or connection to Primavera Unifier.
▪ Ensure that the business processes are enabled for mobile app use, and you have the required access permissions to view the business processes by way of your mobile app.
▪ Contact your Unifier administrator if you have any questions.

## Key features

- Manage tasks and update progress
- Offline work on downloaded data
- Create and update business process records
- Review drawings, PDFs, and images
- Minimize data entry errors with QR/barcodes
- Access project documents
- View project geo-locations

## Recent user reviews (9 of 9)

All indexed reviews: https://appshunter.io/ios/app/oracle-primavera-unifier/id1094474000/reviews.md

### 1/5 — 랙이 심하고 에러도 많음

*2025-09-19*

태스크 열면 버벅이다가 앱이 종료됩니다. 사용 못할 정도에요

### 5/5 — Super Handy for On-the-Go Updates!

*2025-04-07*

The Unifier mobile app makes it so easy to stay on top of project workflows when I'm away from my desk. I can review records, update fields, add comments, and approve steps right from my phone. It’s user-friendly, reliable, and saves me a lot of time during busy days. A must-have if you're using Unifier regularly!

### 5/5 — Huge improvements to the app!

*2023-12-18*

They have been drastic changes to the app and it works great! So convenient when you are on the go. Much more user friendly and intuitive.

### 1/5 — Nothing but issues

*2023-10-21*

Almost every time I try to log in it’s something that gets me mad about this app  I don’t know if it’s iPhone or the app itself but nothing and I mean nothing makes my blood boil as much as this combo please just fix it because right now it’s supreme garbage I even complain about this to people I don’t know  and I hate talking to people.

### 1/5 — Garbage app

*2023-09-08*

Is pretty much useless, now I remember why I uninstalled it months ago.  I logged in fine to begin with, when I went back in I was logged out so I don't know how I would get any notifications about new work orders.  Then I try to log in and it won't let me.  Worst app I have ever used!  What happened to the world famous Oracle ???

### 1/5 — All it does is crash and close.

*2023-08-15*

Can’t do anything. Can’t add new projects. Can’t sync current projects. Can’t download project data.  Every time I do something it just crashes and fails.

### 5/5 — Unifier usability

*2020-05-14*

I have been using Unifier mobile application for few months and it helps me a lot to check my task. I strongly believe Unifier is one of best solution for E&C industry.

### 3/5 — Waiting for the Unifier app.

*2018-09-09*

When is the expected date of release? We can’t go through browsers , it’s hard.

### 1/5 — Version 17.7.0 breaks our 16.2.4

*2017-08-28*

This latest version cause a stuck thread issue with Unifier 16.2.4

## Frequently asked questions about Oracle Primavera Unifier

### What is Oracle Primavera Unifier?

Oracle Primavera Unifier is a mobile application designed to complement the Primavera Unifier desktop software. It enables users to manage project tasks, create business process records, and review documents on the go, even when offline.

### What are the system requirements for Oracle Primavera Unifier?

The mobile app requires a valid license for Primavera Unifier 16.2 and above. For iOS, it supports Apple OS version 12.0 and above. It is available on iPhone and iPad.

### Can I use Oracle Primavera Unifier without an internet connection?

Yes, the app allows field users to work on downloaded project data and documents while offline. Changes can be synchronized with the Unifier server once network connectivity is restored.

### How do I get started with Oracle Primavera Unifier?

You need a valid license for Primavera Unifier 16.2 or higher. Ensure that the business processes you need are enabled for mobile app use and that you have the necessary access permissions. Contact your Unifier administrator for assistance.

### Does Oracle Primavera Unifier have a demo mode?

Yes, the app includes a demo mode that allows you to evaluate its features without requiring a license or a connection to Primavera Unifier.

### How often is Oracle Primavera Unifier updated?

The latest version is 26.4, and it was last updated on April 8, 2026. Oracle recommends upgrading to the latest version to utilize all features, as some recent features are only supported on the newest installations.

### What kind of data can I attach to business process records?

You can attach picture, audio, and video files to a business process record, line item, or task within Oracle Primavera Unifier. This enhances the detail and context of your project documentation.

### Does Oracle Primavera Unifier have ads?

No, Oracle Primavera Unifier does not contain advertisements. It is a free application focused on providing project management functionality.

## Version history (last 5 releases)

### 26.9 — 2026-09-04

• Technical improvements and bug fixes.

### 26.7 — 2026-07-07

• Technical improvements and bug fixes.

### 26.6 — 2026-06-06

Technical improvements and bug fixes.

### 26.5 — 2026-05-10

• Technical improvements and bug fixes.

### 26.4 — 2026-04-08

• Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes.

## Apps similar to Oracle Primavera Unifier

| App | Rating | Price | Category |
| --- | --- | --- | --- |
| [Mobile Shield SA](https://appshunter.io/ios/app/mobile-shield-sa/id6742936461) | — | Free | Business |
| [Echo by Jacobs](https://appshunter.io/ios/app/echo-by-jacobs/id1586017994) | 4.7 (3) | Free | Business |
| [EDOT Inspector and Field](https://appshunter.io/ios/app/edot-inspector-and-field/id1485480149) | 4.8 (17) | Free | Business |
| [EPM Mobile](https://appshunter.io/ios/app/epm-mobile/id1578478043) | 1.0 (1) | Free | Business |
| [RLG Health & Safety](https://appshunter.io/ios/app/rlg-health-and-safety/id1536461348) | 5.0 (5) | Free | Business |
| [Adoddle Field](https://appshunter.io/ios/app/adoddle-field/id1102038543) | 3.4 (10) | Free | Business |

## More apps by Oracle America, Inc.

- [NetSuite SuiteProjects Pro](https://appshunter.io/ios/app/netsuite-suiteprojects-pro/id307099493)
- [Oracle WebCenter Spaces 11g Release 1](https://appshunter.io/ios/app/oracle-webcenter-spaces-11g-release-1/id382334215)
- [Oracle Latista Field](https://appshunter.io/ios/app/oracle-latista-field/id447169718)
- [Oracle Primavera P6 EPPM](https://appshunter.io/ios/app/oracle-primavera-p6-eppm/id457533019)
- [CRM On Demand Connected Mobile](https://appshunter.io/ios/app/crm-on-demand-connected-mobile/id461471424)
- [Oracle Fusion Expenses](https://appshunter.io/ios/app/oracle-fusion-expenses/id516172076)

All apps by Oracle America, Inc.: https://appshunter.io/developer/284793707

## Related topics

[oracle primavera p6 eppm](https://appshunter.io/ios/topics/oracle-primavera-p6-eppm) · [primavera p6](https://appshunter.io/ios/topics/primavera-p6) · [primavera](https://appshunter.io/ios/topics/primavera) · [primavera sound](https://appshunter.io/ios/topics/primavera-sound)

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-09-05.*
