# Simple Change Order

> iPad app for creating, signing, and emailing change orders for contract work. (iPhone/iPad app by Jeremy Breaux.)

- Source: https://appshunter.io/ios/app/simple-change-order/id398549789 (this page in markdown: same URL + `.md`)
- Developer: [Jeremy Breaux](https://appshunter.io/developer/297018636)
- Category: Business, Productivity
- Price: $4.99
- Age rating: 4+
- Requires: iOS 13.4 · 3 MB
- Released: 2010-10-29
- Data updated: 2026-06-10
- Monetization: paid
- User reviews in markdown: https://appshunter.io/ios/app/simple-change-order/id398549789/reviews.md

## What is Simple Change Order?

This iPad app is for companies that want to make it easy to write a change order on the go. Great for anyone that does contract work. 

How To Use

You simply launch Simple Change Order on the iPad, and fill out the customer’s name, date, customer’s address, customer’s phone number, customer’s email address, job name and location in the provided fields.  Next, you fill out the large space with your change order specifications. Then, you fill out the change order price and the previous contract price, the new contract total is calculated by adding the two inputted fields. Finally, you sign your name next to the authorized signature. 

Now, you hand the iPad to the customer and they fill out the date and sign their name. Next, tap the e-mail button and e-mail the customer a copy of the completed form (if you like send yourself a copy too).  The newly created change order agreement is stored in the popular PDF format and is an attachment to the e-mail.

No more hard to read change orders or misunderstandings from poor handwriting! The best part is that Simple Change Order makes your activities greener! No more paper wasted!  

How To Sign Change Order Form

Simply use you finger to sign your name above the available space on the signature line. You can purchase a Pogo Stylus from tenonedesign.com if you want something that has better results.

Tips For a Good Signature

We have found that small strokes make for the best signatures and to take your time signing. You will be very happy with the result.

Note: While the inputted information is stored temporarily until you tap on clear. If you close the app and reopen the signature will not be saved during this time. It is important to e-mail the finished change order agreement upon receiving the iPad back from the person signing. 

SETUP:
How to Load a Company Logo
Tap on the “Load Logo” button on the bottom of the app. Next, read the on-screen instructions. Look for the URL that your iPad is displaying (NOTE: Wireless network access is needed). Next, from your desktop/laptop connected to the same network, type in the URL displayed on the iPad into your internet browser (Safari, Internet Explorer, Firefox, Google Chrome). Be advised to remember to include http:// or your iPad’s webpage might not be displayed. 

Once the webpage is displayed, click on “Choose File” and navigate to the location of your company’s logo. NOTE: the logo file must be named: “logo.png” and is case-sensitive. TIP: 100 x 100 pixels works best.  Click on “Submit” once you have double clicked on your logo.png file. Tap the “Done” button on your iPad and viola! Your logo is displayed.

Alternative method to load company logo:
This app has iTunes file sharing enabled. Simply plug in your iOS device to your iTunes computer to sync it. 

To upload your logo: Select your iOS device on the left column and then click on the “Apps” tab, scroll down to the “File Sharing” heading, select Simple Service Agreement and you will see logo.png file under “Documents”.  Click on “Add” and choose your logo.png file and when iTunes prompts select to overwrite or replace the file.


How To Change the Company Information

Tap on the “Change Company” button. The company information is enabled and you can tap on “Company Name”, “Address 1”, “Address 2”, “Phone”, “Fax or Website”. The keyboard will appear and you can type in the name of your company. When completed, tap on the “Save” button.

NOTICE
The information in this iPad app is designed to provide an easy to build job proposal. It is provided as is, and isn’t necessarily endorsed or approved by this app’s author. Due to the variance of many local, city, county, and state laws, we recommend that you seek professional legal counsel before using this form or entering into any contract or agreement.

## Key features

- Digital change order creation
- Customer and job detail input
- Automated price calculation
- Digital signature capture
- PDF generation and emailing
- Company logo customization

## Recent user reviews (7 of 7)

All indexed reviews: https://appshunter.io/ios/app/simple-change-order/id398549789/reviews.md

### 1/5 — Terrible

*2014-04-08*

Should have trusted the other review that warned not to buy. This app is a complete waste of money. Just throw $5 in the toilet-

### 1/5 — Save your money

*2014-01-13*

This app isn't even worth 99 cents. I should have known since it's called "simple." Is in need of some serious updates, but it looks like it hasn't been updated for 6 months. Signature is difficult to remove and sometimes removes itself? Buy at your own risk.

### 2/5 — Good idea...but needs improvement

*2012-10-04*

I am always on the go and I thought this was a nifty idea to get my change orders out on time.  It is pretty straight forward as far as filling out the basics and I really like the idea of being able to have the customer sign on the spot.  I don't like the fact that I can't save the various change orders, nor can i number them to keep track of them.  At any particular job, there could be as many as 20 change orders and not being able to refer back to them is inconvenient.  It would greatly improve if it had a running list of the change orders and you could go back to make changes on previously generated change orders, instead of having to re-do them from scratch every time.

### 5/5 — Simple purchase order

*2012-05-11*

This app is awesome for changes in the field. Simple to use. Works exactly as described if you follow the instructions.

### 3/5 — It would be great if all the buttons worked

*2011-10-19*

Not all the buttons work and you can't use all the fields. It loaded a stupid looking logo that I can't get off so customers would just think I'm a cheese ball. Would be very useful but looks like another blown 5 bucks

### 1/5 — Doesn't work

*2011-02-02*

Needs lots of work...looks good but that is about it

### 3/5 — Numbering

*2010-11-14*

You need a way of numbering the change orders as well as a folder system.

## Frequently asked questions about Simple Change Order

### What is Simple Change Order?

Simple Change Order is an iPad application designed to help businesses easily create, sign, and email change orders. It digitizes the process, eliminating the need for paper forms and improving legibility.

### How do I create a change order with Simple Change Order?

Launch the app on your iPad and fill in customer details, job information, pricing, and specifications. Both you and the customer can then digitally sign the document before emailing it as a PDF.

### Can I add my company logo to the change orders?

Yes, Simple Change Order allows you to load your company logo. You can do this wirelessly by accessing a URL displayed on your iPad from your computer, or by using iTunes file sharing.

### What devices does Simple Change Order support?

Simple Change Order is exclusively designed for the iPad. It requires iPadOS and is available for devices with an age rating of 4+.

### How much does Simple Change Order cost?

Simple Change Order is a paid application, available for a one-time purchase of $4.99. There are no in-app purchases or subscriptions required.

### Does Simple Change Order have ads?

No, Simple Change Order is ad-free. As a paid application, it does not contain advertisements, providing an uninterrupted user experience.

### How often is Simple Change Order updated?

The app was last updated on December 21, 2022, with version 2.2.0. While specific update frequency isn't detailed, this indicates ongoing support and potential for future enhancements.

### What happens if I close Simple Change Order before emailing the change order?

The inputted information is temporarily stored until you tap 'clear'. If you close and reopen the app before emailing, the signature will not be saved. It is important to email the completed agreement immediately after receiving the customer's signature.

## Version history (last 5 releases)

### 2.2.0 — 2022-12-21

+iOS 16 Update

### 2.1.1 — 2019-11-06

+iOS 13 Update
+Default app to use Light mode for proper screen and PDF rendering

### 2.1.0 — 2019-11-05

+iOS 13 Update

### 2.0.0 — 2018-05-11

+iOS 11 Update

### 1.08 — 2016-12-12

+iOS 10 Update

## More apps by Jeremy Breaux

- [Drywall Calculator](https://appshunter.io/ios/app/drywall-calculator/id306259236)
- [Concrete Calculator Pro](https://appshunter.io/ios/app/concrete-calculator-pro/id318558847)
- [Asphalt Calculator](https://appshunter.io/ios/app/asphalt-calculator/id321122113)
- [Roofing Calculator](https://appshunter.io/ios/app/roofing-calculator/id321916105)
- [Friction Loss Calc](https://appshunter.io/ios/app/friction-loss-calc/id350406517)
- [IT Organizer](https://appshunter.io/ios/app/it-organizer/id354016094)

All apps by Jeremy Breaux: https://appshunter.io/developer/297018636

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-06-10.*
