# Simple Change Order — user reviews

> 7 indexed App Store user reviews of Simple Change Order by Jeremy Breaux.

- Source: https://appshunter.io/ios/app/simple-change-order/id398549789/reviews
- App overview in markdown: https://appshunter.io/ios/app/simple-change-order/id398549789.md

## Most critical reviews (7 lowest-rated)

### 1/5 — Terrible

*2014-04-08*

Should have trusted the other review that warned not to buy. This app is a complete waste of money. Just throw $5 in the toilet-

### 1/5 — Save your money

*2014-01-13*

This app isn't even worth 99 cents. I should have known since it's called "simple." Is in need of some serious updates, but it looks like it hasn't been updated for 6 months. Signature is difficult to remove and sometimes removes itself? Buy at your own risk.

### 1/5 — Doesn't work

*2011-02-02*

Needs lots of work...looks good but that is about it

### 2/5 — Good idea...but needs improvement

*2012-10-04*

I am always on the go and I thought this was a nifty idea to get my change orders out on time.  It is pretty straight forward as far as filling out the basics and I really like the idea of being able to have the customer sign on the spot.  I don't like the fact that I can't save the various change orders, nor can i number them to keep track of them.  At any particular job, there could be as many as 20 change orders and not being able to refer back to them is inconvenient.  It would greatly improve if it had a running list of the change orders and you could go back to make changes on previously generated change orders, instead of having to re-do them from scratch every time.

### 3/5 — It would be great if all the buttons worked

*2011-10-19*

Not all the buttons work and you can't use all the fields. It loaded a stupid looking logo that I can't get off so customers would just think I'm a cheese ball. Would be very useful but looks like another blown 5 bucks

### 3/5 — Numbering

*2010-11-14*

You need a way of numbering the change orders as well as a folder system.

### 5/5 — Simple purchase order

*2012-05-11*

This app is awesome for changes in the field. Simple to use. Works exactly as described if you follow the instructions.

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-06-10.*
