# SiteTicket: Change Order App — T&M tickets. Signed on site.

> Mobile app for creating and signing change orders and T&M tickets on-site. (iPhone/iPad app by Haicheng Maoyu Network Technology Co., Ltd..)

- Source: https://appshunter.io/ios/app/siteticket-change-order-app/id6782822281 (this page in markdown: same URL + `.md`)
- Developer: [Haicheng Maoyu Network Technology Co., Ltd.](https://appshunter.io/developer/1783992206)
- Category: Business, Productivity
- Price: Free with in-app purchases
- Rating: 5.00/5 from 1 App Store ratings
- Age rating: 4+
- Requires: iOS 17.0 · 19 MB
- Languages: American English
- Released: 2026-07-08
- Data updated: 2026-08-03
- Monetization: free with in-app purchases
- User reviews in markdown: https://appshunter.io/ios/app/siteticket-change-order-app/id6782822281/reviews.md

## What is SiteTicket?

You did the extra work. The customer said "go ahead." Then the invoice lands and suddenly nobody remembers saying that.

SiteTicket turns the rough note you'd scribble on site into a clean change order: what changed, why it costs more, the labor and material lines, the photos, and the customer's signature. Two minutes, before you pick your tools back up.


HOW IT WORKS

Write the site note the way you'd actually say it. "Move three outlets higher, cabinets went in first, verbal OK from owner."
Let AI draft it into clear scope and approval wording. Your facts stay your facts: quantities, times, and boundaries are preserved, and it never invents prices or legal terms.
Add cost lines and job photos.
Get the signature, then share a PDF, text the customer a summary, or paste a note into your invoicing app.
WHAT YOU GET

Change orders and T&M tickets from one rough note
Labor and material line items
Job photos attached as evidence
On-site signature capture, or a record of the verbal approval
Written reply approvals: attach up to 3 screenshots of the customer's text or email, printed on the PDF beside the approval record
Clean customer PDF
Copy-ready text for customer messages and invoice notes
Ticket history on your phone
WORKS WITH WHAT YOU ALREADY USE

SiteTicket is not another system to run your business from. Keep your invoicing app, your spreadsheet, your texts. SiteTicket handles the moment those tools miss: getting the change approved in writing while you're still standing in front of the customer.

WHO IT'S FOR

Electricians, plumbers, remodelers, handymen, painters, roofers, property maintenance. Anyone who hears "while you're here, could you also..." every week.

FREE TO START

Tickets, signatures, and PDFs are free with no limit. You get 3 AI drafts every month for free. If extra work shows up more often than that, subscriptions unlock 25 to 300 AI drafts a month. Apple shows the exact price before you buy, and you can cancel anytime.

Questions or a feature you need? Email qinze5577@gmail.com. It's a small operation, so you'll get an answer from the person who builds the app.

Terms of Use: https://www.apple.com/legal/internet-services/itunes/dev/stdeula/
Privacy Policy: https://ryooma.com/siteticket/privacy-policy

## Key features

- On-site change order creation
- AI-assisted drafting
- Labor and material line items
- Job photo attachment
- Customer signature capture
- PDF and text summary generation
- Ticket history

## Pricing and in-app purchases

Base price: Free.

**Subscriptions**

| Subscription | Price | Period |
| --- | --- | --- |
| Core | $4.99 | per month |
| Plus | $9.99 | per month |
| Pro Monthly | $19.99 | per month |
| Pro Annual | $199.99 | per year |



## Frequently asked questions about SiteTicket

### What is SiteTicket used for?

SiteTicket helps tradespeople create and get signed change orders and T&M tickets directly on-site. It turns rough notes into professional documents with labor, materials, photos, and customer signatures.

### How does SiteTicket's AI drafting work?

The AI assists in drafting clear scope and approval wording from your site notes. It preserves your factual details like quantities and times without inventing prices or legal terms.

### Can I integrate SiteTicket with my existing invoicing app?

Yes, SiteTicket is designed to work with your current tools. You can paste notes into your invoicing app or share PDFs and summaries, bridging the gap for on-site approvals.

### What are the subscription options for SiteTicket?

SiteTicket offers tiered subscriptions starting at $4.99/month for 'Core', $9.99/month for 'Plus', and $19.99/month for 'Pro Monthly'. A 'Pro Annual' plan is also available for $199.99/year, unlocking more AI drafts per month.

### Is SiteTicket available on Android devices?

Based on the provided data, SiteTicket is available on iPhone and iPad. Information regarding Android availability was not specified.

### How often is SiteTicket updated?

The app was last updated on July 12, 2026, with version 1.2. This indicates a recent update, suggesting ongoing development and support.

### What is the user sentiment for SiteTicket?

The app has a perfect rating of 5.0 stars from 1 review, indicating a highly positive initial user experience. Specific details on what users like or dislike were not provided.

### Does SiteTicket have ads?

No, SiteTicket does not contain advertisements. The app is free to start with optional in-app purchases for additional AI drafts.

## Version history (last 4 releases)

### 1.3 — 2026-07-29

Customer approved by text? That reply now lives on the ticket.

• New approval method: Written reply — for customers who approve by text or email
• Attach up to 3 screenshots of the customer's reply; they print on the PDF right next to the approval record
• The same approval line appears in the copy-ready text, so your invoice note and your PDF always match
• Typing numbers is more reliable, and the number keyboard now has a Done button
• Name and address fields no longer fight autocorrect

Tickets, signatures, and PDFs stay free. AI drafting includes 3 free runs a month.

### 1.2 — 2026-07-12

Clearer approval records: signer name, unambiguous timestamps with time zone, and photo timestamps on the PDF
A heads-up before exporting a ticket that has no cost lines
Formatting fixes throughout

### 1.1 — 2026-07-10

Every plan now includes 3 free AI drafts each month. Write the site note, tap Draft, and see the change order before deciding whether to subscribe.
Clearer plans screen: each plan now says what job load it covers instead of listing quota numbers.
Small wording fixes throughout.

### 1.0 — 2026-07-09

No release notes.

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-08-03.*
