# SKYGATE: Flight Delay Claim — Gate Alerts, Refund & Live Map

> Gate Alerts, Refund & Live Map (iPhone/iPad app by HUGO ANATOLE PAUL MORICEAU.)

- Source: https://appshunter.io/ios/app/skygate-flight-delay-claim/id6780298113 (this page in markdown: same URL + `.md`)
- Developer: [HUGO ANATOLE PAUL MORICEAU](https://appshunter.io/developer/1845368412)
- Category: Travel, Productivity
- Price: Free with in-app purchases
- Age rating: 4+
- Requires: iOS 17.0 · 28 MB
- Languages: American English, Arabic, Bulgarian, Catalan, Croatian, Czech, Danish, Dutch, Finnish, French (France) and 25 more
- Released: 2026-06-21
- Data updated: 2026-09-26
- User reviews in markdown: https://appshunter.io/ios/app/skygate-flight-delay-claim/id6780298113/reviews.md

## What is SKYGATE?

Get up to €600 back when your flight is delayed or cancelled — automatically.
Start your free 3-day trial.

SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard.

REAL-TIME TRACKING
- Live gate changes, delays and cancellations, updated continuously
- Full timeline: pushback, takeoff, cruise, landing, baggage
- Live plane position on the map with altitude and speed
- Dynamic Island and Live Activity: your gate at a glance

AI RESCUE - YOUR RIGHTS, INSTANTLY
When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights.

FAMILY & TEAM (SkyGroup)
Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync.

PREDICTIVE DELAY SCORE
On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather.

PREMIUM
Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh.

Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.

## Pricing and in-app purchases

Base price: Free.

**Subscriptions**

| Subscription | Price | Period |
| --- | --- | --- |
| SKYGATE Premium Annual | $19.99 | per year |
| SKYGATE Premium Monthly | $2.99 | per month |



## Version history (last 5 releases)

### 1.2.7 — 2026-09-16

• Maintenance update: internal fixes only — everything works exactly as before.
• Stability and performance improvements.

### 1.2.6 — 2026-09-08

Smarter refreshes, and two Settings fixes.

• Each flight is now refreshed on its own schedule: one that is months away is checked a few times a day, one that is boarding every few minutes. Opening the app or a background wake no longer re-checks flights that are not due, so SKYGATE uses less data and battery, and live data stays fresh on the day it matters. Pull down to refresh still refreshes everything at once.
• Settings now shows the flight limit that actually applies to your plan, instead of a fixed number.
• The Rate SKYGATE button in Settings now opens the App Store as intended.

### 1.2.5 — 2026-08-26

Less background data, and a clearer start.

• The example flight on a new install now explains itself: one tap to remove it, one to add the flight you're actually taking.
• Tap a country in Stats for a calendar of the days you spent there — handy if you're counting against a 90/180 allowance — and every flight now names its airline, not just its logo.
• Big reduction in network use while you fly. Your plane's position comes from live ADS-B and the schedule is re-checked less often, so SKYGATE uses less data and less battery. Gate changes and delay alerts are unchanged.
• A fix that was quietly costing everyone: the sample flight on the dashboard was being refreshed like a real one, forever.
• The free plan now tracks one active flight at a time, instead of three. If you already track more, you keep them — nothing is removed.

### 1.2.4 — 2026-08-21

Your arrival time is now the destination's time.

• A flight landing in Geneva shows the Geneva time — on the card, in the detail header, in the change log, on the Lock Screen and in the widgets.
• The Live Activity and the widgets never had the airport database they needed to be right. They do now, and the medium and large widgets gained an Arrives row.
• Tap any country in Stats to see every flight that took you there, with real departure and arrival dates.
• New: days spent per country, with a Schengen 90/180 meter counted across the whole area — so you can check an allowance before you blow it. Counted from the flights you track, entry and exit day included.
• Bulgarian and Serbian were fully translated but the app never offered them. Fixed.
• Fixes the rating prompt: tapping “Rate SKYGATE” asked for the App Store sheet while the panel was still open, and iOS discards a request made that way. It now opens properly — and the app asks at a quiet moment, at most once in a long while, and never again after you say no.

### 1.2.3 — 2026-08-14

The board now tells the truth about where your flight is.

• Flights no longer show as "In the Air" days before they leave, and a flight that has already landed no longer sits under Upcoming.
• The live map works everywhere: the airport database went from 55 airports to 5,330. That also fixes arrival times that were an hour out when your phone and your destination were in different timezones.
• In the air, the Lock Screen counts down to landing instead of to a departure that already happened — and you see how late you will ARRIVE, not how late you left.
• Gates are found more often, and when the airline hasn't published one yet the app says when to expect it.
• New: the cabin your airline actually flies on this aircraft, and shareable cards of everywhere you've been.

## Apps similar to SKYGATE

| App | Rating | Price | Category |
| --- | --- | --- | --- |
| [MODE 1090: Plane Spotting](https://appshunter.io/ios/app/mode-1090-plane-spotting/id6795101033) | — | Free | Travel |
| [Flight & Train Claim](https://appshunter.io/ios/app/flight-and-train-claim/id6748158725) | — | $0.99 | Travel |
| [Stacky: Flight Tracker & Trips](https://appshunter.io/ios/app/stacky-flight-tracker-and-trips/id6778837620) | — | Free | Travel |
| [شرفت](https://appshunter.io/ios/app/id6744579729) | — | Free | Travel |
| [RAAHII](https://appshunter.io/ios/app/raahii/id6799295351) | 5.0 (1) | Free | Travel |
| [From Plane with Love](https://appshunter.io/ios/app/from-plane-with-love/id6799521937) | — | Free | Travel |

## More apps by HUGO ANATOLE PAUL MORICEAU

- [Neo Run Cube: Neon Runner](https://appshunter.io/ios/app/neo-run-cube-neon-runner/id6753875405)
- [OSHI: Offline Messenger](https://appshunter.io/ios/app/oshi-offline-messenger/id6753926350)
- [PicSwipe: Photo&Video Cleaner](https://appshunter.io/ios/app/picswipe-photo-and-video-cleaner/id6755610331)
- [FieldNote: Inspection Reports](https://appshunter.io/ios/app/fieldnote-inspection-reports/id6778972333)
- [Chiche - Road Trip Challenges](https://appshunter.io/ios/app/chiche-road-trip-challenges/id6779551915)
- [Supernova: Idle Star Forge](https://appshunter.io/ios/app/supernova-idle-star-forge/id6779555607)

All apps by HUGO ANATOLE PAUL MORICEAU: https://appshunter.io/developer/1845368412

## Related topics

[flyoverme](https://appshunter.io/ios/topics/flyoverme)

---

*Data collected daily from the US App Store and indexed by [AppsHunter](https://appshunter.io/). User reviews are verbatim App Store reviews. Ratings, prices and chart positions refresh continuously; this snapshot is from 2026-09-26.*
