# Oracle Primavera Cloud vs WINT

The clearest difference is rating: WINT at 3.7 against Oracle Primavera Cloud's 3.3. Oracle Primavera Cloud's advantage is update cadence (every 2 months vs every 8 months). On price, ratings volume, ads and in-app purchases there is nothing between them.

Both are free to download. Neither carries in-app purchases, so what you see is what you pay.

WINT holds the better App Store score, 3.7 against 3.3. Both are backed by a comparable volume of ratings — 4 and 3 respectively.

Oracle Primavera Cloud ships an update every 2 months, WINT every 8 months. The most recent releases landed on October 17, 2026 and October 6, 2026 respectively.

## The numbers

| Metric | Oracle Primavera Cloud | WINT |
| --- | --- | --- |
| Price | Free | Free |
| Rating | [3.3 (4 ratings)](https://appshunter.io/ios/app/oracle-primavera-cloud/id1336145396/reviews) | **[3.7 (3 ratings)](https://appshunter.io/ios/app/wint-water-intelligence/id1475760554/reviews)** |
| Number of ratings | **4** | 3 |
| Positive reviews | 0.0% of reviews | — |
| In-app purchases | No | No |
| Ads | No | No |
| Update frequency | **Every 2 months** | Every 8 months |
| Monetization | Free | Free |
| Size | 31 MB | 32 MB |
| Requires iOS | 18.0 | **17.6** |
| Devices | iPhone, iPad | iPhone, iPod |
| Age rating | 4+ | 4+ |
| Developer | [Oracle America, Inc.](https://appshunter.io/developer/284793707) | [WINT WI LTD](https://appshunter.io/developer/1475760553) |

## What reviewers say

### Oracle Primavera Cloud

[App page](https://appshunter.io/ios/app/oracle-primavera-cloud/id1336145396)

Update project progress and monitor performance from anywhere. Access project details offline, update assigned tasks, and view project files. Gain insights into project health and deadlines with powerful overviews.

**Highlights:** Offline project access, On-site progress updates, Project performance overviews, Visual work plan management, Project file browsing and saving, Communication with task performers

**In-app purchases:** none


### WINT

[App page](https://appshunter.io/ios/app/wint-water-intelligence/id1475760554)

This app helps businesses reduce water waste and environmental impact using AI and IoT. It provides real-time data and insights to identify leaks, cut consumption by an average of 25%, and prevent costly water damage.

**Highlights:** AI-powered leak detection, Real-time water data access, Consumption insights, Waste reduction tools, Remote issue diagnosis, Environmental footprint reduction

**Features:** macOS Compatibility

**In-app purchases:** none


## Frequently asked questions

### Is Oracle Primavera Cloud free?

Oracle Primavera Cloud is free to download, with no in-app purchases.

### Is WINT free?

WINT is free to download, with no in-app purchases.

### Which has better reviews, Oracle Primavera Cloud or WINT?

WINT is rated higher. Oracle Primavera Cloud averages 3.3 out of 5 from 4 ratings, while WINT averages 3.7 from 3 ratings.

### Do Oracle Primavera Cloud or WINT have ads?

Neither Oracle Primavera Cloud nor WINT shows ads.

### Which is updated more often, Oracle Primavera Cloud or WINT?

Oracle Primavera Cloud ships an update every 2 months, and WINT every 8 months. Most recently, Oracle Primavera Cloud was updated on October 17, 2026 and WINT on October 6, 2026.

---

*Compared by [AppsHunter](https://appshunter.io/) from daily US App Store data. Review summaries are generated from verbatim App Store reviews.*
