# Oracle Primavera Cloud vs ZeroPunch

The clearest difference is review sentiment: ZeroPunch at 50% against Oracle Primavera Cloud's 0%. ZeroPunch also leads on rating (4.6 vs 3.3) and update cadence (every 2 days vs every 2 months). On price, ratings volume, ads and in-app purchases there is nothing between them.

Both are free to download. Neither carries in-app purchases, so what you see is what you pay.

ZeroPunch holds the better App Store score, 4.6 against 3.3. Both are backed by a comparable volume of ratings — 4 and 11 respectively. Written reviews point the same way: 0% of Oracle Primavera Cloud's written reviews are positive against 50% of ZeroPunch's.

Oracle Primavera Cloud ships an update every 2 months, ZeroPunch every 2 days. The most recent releases landed on October 7, 2026 and October 12, 2026 respectively.

## The numbers

| Metric | Oracle Primavera Cloud | ZeroPunch |
| --- | --- | --- |
| Price | Free | Free |
| Rating | [3.3 (4 ratings)](https://appshunter.io/ios/app/oracle-primavera-cloud/id1336145396/reviews) | **[4.6 (11 ratings)](https://appshunter.io/ios/app/zeropunch/id6753096907/reviews)** |
| Number of ratings | 4 | **11** |
| Positive reviews | 0.0% of reviews | **50.0% of reviews** |
| In-app purchases | No | No |
| Ads | No | No |
| Update frequency | Every 2 months | **Every 2 days** |
| Monetization | Free | Free |
| Size | 31 MB | 130 MB |
| Requires iOS | 18.0 | **17.6** |
| Devices | iPhone, iPad | iPhone, iPad |
| Age rating | 4+ | 4+ |
| Developer | [Oracle America, Inc.](https://appshunter.io/developer/284793707) | [DAERO](https://appshunter.io/developer/1842500240) |

## What reviewers say

### Oracle Primavera Cloud

[App page](https://appshunter.io/ios/app/oracle-primavera-cloud/id1336145396)

Update project progress and monitor performance from anywhere. Access project details offline, update assigned tasks, and view project files. Gain insights into project health and deadlines with powerful overviews.

**Highlights:** Offline project access, On-site progress updates, Project performance overviews, Visual work plan management, Project file browsing and saving, Communication with task performers

**In-app purchases:** none


### ZeroPunch

[App page](https://appshunter.io/ios/app/zeropunch/id6753096907)

Streamline site walks and documentation with voice, photo, and location capture. This app automatically generates structured tasks, significantly reducing documentation time for construction professionals. It simplifies coordination and speeds up project closeout, with direct integration for enhanced workflow.

**Highlights:** Voice, photo, and location capture, Automated structured task creation, Reduces documentation time by up to 70%, Simplifies coordination, Speeds up project closeout, Procore integration

**In-app purchases:** none


## Frequently asked questions

### Is Oracle Primavera Cloud free?

Oracle Primavera Cloud is free to download, with no in-app purchases.

### Is ZeroPunch free?

ZeroPunch is free to download, with no in-app purchases.

### Which has better reviews, Oracle Primavera Cloud or ZeroPunch?

ZeroPunch is rated higher. Oracle Primavera Cloud averages 3.3 out of 5 from 4 ratings, while ZeroPunch averages 4.6 from 11 ratings.

### Do Oracle Primavera Cloud or ZeroPunch have ads?

Neither Oracle Primavera Cloud nor ZeroPunch shows ads.

### Which is updated more often, Oracle Primavera Cloud or ZeroPunch?

Oracle Primavera Cloud ships an update every 2 months, and ZeroPunch every 2 days. Most recently, Oracle Primavera Cloud was updated on October 7, 2026 and ZeroPunch on October 12, 2026.

---

*Compared by [AppsHunter](https://appshunter.io/) from daily US App Store data. Review summaries are generated from verbatim App Store reviews.*
