# VPN vs TeamsProjects

The clearest difference is in-app purchases: TeamsProjects at none against VPN's 10. TeamsProjects also leads on ads (none vs shown) and iOS requirement (14.0 vs 16.0). VPN's advantage is chart position (#9 vs unranked). On price and device support there is nothing between them.

Both are free to download. VPN sells 10 in-app purchases, starting at $9.99 per 7 days. TeamsProjects asks for nothing beyond the download.

## The numbers

| Metric | VPN | TeamsProjects |
| --- | --- | --- |
| Price | Free | Free |
| Rating | **[4.6 (2.1M ratings)](https://appshunter.io/ios/app/vpn-super-unlimited-proxy/id1370293473/reviews)** | — |
| Number of ratings | **2.1M** | — |
| Positive reviews | 90.5% of reviews | — |
| In-app purchases | Yes | **No** |
| Ads | Yes | **No** |
| Update frequency | Weekly | — |
| Monetization | Free with in-app purchases | — |
| Best chart rank | **#9** | — |
| Size | 162 MB | 4 MB |
| Requires iOS | 16.0 | **14.0** |
| Devices | iPhone, iPad, Apple TV | iPhone, iPad, iPod |
| Age rating | 4+ | 4+ |
| Developer | [Mobile Jump Pte Ltd](https://appshunter.io/developer/1484585154) | [Synapse Asesores Informaticos, S.L.](https://appshunter.io/developer/423293257) |

## What reviewers say

### VPN

[App page](https://appshunter.io/ios/app/vpn-super-unlimited-proxy/id1370293473)

**Currently charting:** #9 Top Grossing · Productivity, #14 Top Free · Productivity, #107 Top Free, #167 Top Grossing (US App Store)

This app provides a free, unlimited VPN service with no activity logs and military-grade encryption. It offers access to content from over 40 server locations and supports multiple VPN protocols. Premium plans are available for enhanced features.

**Highlights:** Unlimited speed, bandwidth, and time, Access content from 40+ server locations, 5,000+ servers for free users, No activity logs, Military-grade encryption, No registration needed

**Features:** macOS Compatibility, Vision Pro support

**In-app purchases (10)**

| Purchase | Price | Billing |
| --- | --- | --- |
| 1-Week Plan Discount | $9.99 | per 7 days |
| 1-Week Plan | $9.99 | per 7 days |
| 1-Month Plan Discount | $12.99 | per month |
| 1-Month Plan | $12.99 | per month |
| 3-Month Plan | $24.99 | per 3 months |
| 3-Month Plan Discount | $24.99 | per 3 months |
| 3-Month Plan SG-2 | $24.99 | per 3 months |
| 6-Month Plan | $59.99 | per 6 months |
| 12-Month Plan Discount | $79.99 | per year |
| 12-Month Plan | $79.99 | per year |

**What reviewers like**

- 🚀 Fast and reliable connection
- 👍 Easy to use interface
- 🔒 Secure and private
- 💡 Wide selection of server locations
- 👍 Effective for bypassing geo-restrictions

**What reviewers complain about**

- 🐛 Occasional connection drops
- 🔋 Can drain battery quickly
- 📢 Intrusive ads
- 🔍 Ambiguous privacy policy

**Reported bugs**

- Freezes and crashes on older devices
- Fails to connect to certain servers

**Requested features**

- More Netflix-compatible servers
- Automatic reconnect option
- Ability to favorite/bookmark servers


### TeamsProjects

[App page](https://appshunter.io/ios/app/teamsprojects/id6759005760)

**Features:** macOS Compatibility, Vision Pro support

**In-app purchases:** none


## Frequently asked questions

### Is VPN free?

VPN is free to download, with in-app purchases available.

### Is TeamsProjects free?

TeamsProjects is free to download, with no in-app purchases.

### Do VPN or TeamsProjects have ads?

VPN shows ads; TeamsProjects does not.

---

*Compared by [AppsHunter](https://appshunter.io/) from daily US App Store data. Review summaries are generated from verbatim App Store reviews.*
