
Free
About
In this simulation the configuration of a mobile road signaling equipment must be carried out, three traffic signals must be projected, for them the simulation recreates a test laboratory with the mobile signaling equipment, an instrumented and sealed circuit, a voltage source, a signal generator and an industrial push button for the entry of the traffic signals.
Show more
What's New in Cloudlabs Hardware Registers
1.0
August 18, 2024
