
Concrete Calculator Foundation
Footings, rebar and formwork
0 ratings
Free
Rating summary
About
Pouring a footing or a slab this month? Foundation works out the concrete, the steel and the forms, and shows how it got each number before you call the plant or the lumber yard.
CONCRETE AND BAGS
Volume for slabs, strip footings, piers and any box or tube, in cubic yards and cubic meters. You get a premix bag count, or a site mix by the bucket: cement, sand, gravel and water for one bag. In the US the recipe is written per 94 lb sack and 5 gallon bucket. If your sand is wet, the app takes its water off.
YOUR COUNTRY'S NUMBERS
Choose the US, UK, Germany, Poland, Spain, France or the rest of the EU. Concrete grades, exposure classes, bar names, lap lengths and the frost line then follow that country, and each figure says where it comes from.
REBAR AND TIES
Bars or mesh, laps and stock lengths, plus how much tie wire and how many chairs and spacers to buy. A cross section shows where the cage sits and how much cover it keeps.
FORMS YOU CAN SEE
An isometric drawing of the forms with their sizes. Under it is the takeoff: contact area, boards, studs, walers, stakes, spreaders and form ties, cut from the stock lengths at your yard.
POUR AND CURE
Layer depth and where to put the vibrator, then a curing timeline for your cement and the air temperature. Hot, cold and freezing days get a warning.
A FIELD GUIDE ON THE PHONE
22 short articles with diagrams on grades, lap splices, cover, vibrating, curing, cold weather and ordering a truck. Search works on site without a signal.
Every result lists what it assumed, such as waste, bag yield and the mix. Foundation estimates quantities for planning. It does not do structural design, so check soil, loads and local code with your building department or an engineer.
Show more
+2
What's New in Concrete Calculator Foundation
1.2.0
November 14, 2026
A big update for the whole footing. • Pick your country (US, UK, Germany, Poland, Spain, France or EU) for grades, bar names, laps and frost depth. • Rebar with tie wire, chairs and spacers, and a cross section drawing. • Water per bag and a bucket recipe for site mixes, per 94 lb sack in the US. • Formwork takeoff with a 3D drawing of the forms. • A pour plan for the vibrator and a curing timeline with weather warnings. • 22 guide articles with diagrams and search, all offline. Short imperial lengths now read in inches.
More




