
Forest Metrix
Professional timber cruising
Details
Background Location Access
About
What's New in Forest Metrix
4.0.802
November 13, 2026
Fixes and improvements since 4.0.801. SYNC • An upload that took more than 30 seconds could be sent again and again, which slowed syncing. It is now sent once, in smaller batches. • A new tally waits for its plot to reach the server instead of being refused and sent again. • Properly handles plots in a stand that another device deleted. TALLY AND SAMPLING • Duplicate Tree gives the new tree its own product logs and log volumes. Before, it could take them from the original tree. • A stand can no longer mix 100% tally plots with sampled plots, which threw off the stand's per-acre figures. The screen says why when a move is refused. • New Plot starts on the stand's BAF, and a different BAF picked for a plot is kept for that plot. • Changing a project's or a stand's BAF asks what plots already tallied should do. STANDS AND BOUNDARIES • Replacing a project boundary moves the stand that used the old boundary, and asks first if stands would be left on the previous lot. • A project's last stand keeps an outline when the boundary is replaced or another stand is deleted. • A deleted stand outline stays deleted after a sync. • Undo works after Refactor by Soil and Refactor by Forested. • A stand can have holes, so filling a parcel around patch stands makes one shape. • One part of a multi-part stand can be moved to another stand. • Importing stands warns when shapes in the file overlap. • Isolate Non-forested treats Vermont's leaf-off lidar the way it treats New Hampshire's, and Group hedgerows starts unticked. • The buttons along the bottom of the Stands screen fit on a phone.
More


