Laboro.

Laboro.

Live 3D, permits and drops

0 ratings
Free
In-App Purchases

Rating summary

Details

Released
September 1, 2026
Updated
October 19, 2026

Features

Laboro. screenshot #1 for iPhone
Laboro. screenshot #2 for iPhone
Laboro. screenshot #3 for iPhone
Laboro. screenshot #4 for iPhone
Laboro. screenshot #5 for iPhone
iphone
ipad
🖼️Get Icon
Icons↘︎

About

Laboro runs NYC facade jobs — LL11 / FISP repairs, restoration, sidewalk sheds and scaffolds — from the drawing set to the last sign-off. Five sections, in the order the job happens: Live · Building · Schedule · Field · Contract. LIVE — THE JOB TODAY • The building in 3D at today's date, or any date: the drops working with their crews, the sidewalk shed and the roof protection while they're up, and your team in the trailer • Play the job week by week • Site brief: Done · Next · Blocked · Decide, straight from your schedule and the field • Weather from the National Weather Service: wind over 30 mph (gusts count) stops the suspended scaffold, rain stops pointing and coatings, under 40°F holds the mortar. Weather days are marked; you decide which ones count as non-working days • Share with the owner: one link, an optional 4-digit PIN, your logo and colors. The owner sees the 3D, the brief, the photos, the team by role and name (never phone numbers), the weather and the days lost. Never the money BUILDING — DRAWINGS, 3D MODEL, FILES • Upload the drawing set: every sheet listed by its title-block number — roof plan, elevations, details • Measure right on the sheet • Build the 3D from the architect's elevations: windows, floor levels, bands, cornice • Draw the drops on every facade, the sidewalk shed sized by code (BC 3307.6.3), roof and overhead protection, controlled access zones • Several buildings under one contract, in one 3D • Every file in the cloud, the same on iPhone, iPad and the web SCHEDULE — PERMITS FIRST, THEN THE DROPS • Permits: DOB filings, work permits, the sidewalk shed permit (issued, expires, renew by) and the TR1 special inspections. If a permit blocks the schedule, it says so • DOB NOW permits and DOB / ECB violations for each BIN • Master schedule: a Gantt by drop and rig. Type or drag any start or duration and it stays; an order that doesn't make sense gets flagged • Next 2 weeks: the lookahead by zone, filled from the master, ready for the crew meeting • Your company's holidays and working days, and the Work Schedule PDF FIELD — WHAT GOT DONE, DROP BY DROP • The engineer's tags on each drop's elevation sheet: mark what's done with the quantity and a photo • Initial and Final for each drop, signed by the engineer or the foreman • Links for the engineer and the foreman, no account needed • Field reports and the weekly inspection log, with dated photos CONTRACT — THE MONEY, NEVER SHARED • Bid form, locked as the bid when the job is awarded • Quantities against the contract, filled from the field marks, code by code • Change orders with a backup page of marks and photos • Forecast by month from the master, the 3D and your price book YOUR COMPANY • Your logo; the colors come from it and you can change them • People with roles — PM, super, safety — and a foreman for each crew • Company plan for the whole team, with admins WHO DOES WHAT TR1 and TR8 are sealed by the RDP. Laboro runs the PM's side: it coordinates the inspections, gets the work ready to pass and hands the engineer an inspection-ready package. iPhone, iPad and the web, with the same account. Want to look around first? Open the sample job: fictitious, complete and read-only. Terms of Use (EULA): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Privacy Policy: https://laboro.nyc/privacy
Show more
+1

What's New in Laboro.

1.9.0

October 19, 2026

Laboro 1.9 — a new look, and five sections in the order of the job: Live · Building · Schedule · Field · Contract. • Live: the job in 3D at any date — crews on the drops, the sidewalk shed, the site brief and Play. It opens every project, and it's what the owner sees. • Your company: upload your logo and the colors come from it (you can change them). People with roles, and a foreman for each crew. • Weather from the National Weather Service: wind over 30 mph (gusts count), rain, and cold under 40°F. Weather days show on the schedule; you choose which ones become non-working days. • Owner link: your brand, the team by role and name (no phone numbers), the weather and the days lost. Contract is never shared. • Schedule starts with permits, then the master and the next 2 weeks. Field holds the inspections and reports. Contract holds the bid, quantities, change orders and the forecast.

More
3

Subscriptions & In-App Purchases

$19.00

10 Analyses

10 plan analyses. Credits never expire.

Developer apps