
ISM AI Pilot
Vessel Management System
About
What's New in ISM AI Pilot
2.71
November 4, 2026
ISM AI Pilot 2.71 • Stocktake to requisition: when a stocktake of spares, stores or the medicine chest is signed, whatever is at or below its re-order point goes straight into a draft requisition, by department. • The re-order point now follows real use: the minimum plus what the vessel uses during the supplier's lead time, worked out from the last year and past deliveries. • Parts already on an open order count as stock, so nothing is ordered twice. Spares for critical equipment come first, and parts needed for coming maintenance jobs are included. • Export one order or the whole list to Excel, Word or JSON. • Scan an order's QR code, on the screen or on the box label, to open it ready for receiving; confirmed lines go straight into the spares and stores. • Plan wizard: build a new vessel's maintenance plan in five steps — kind of vessel, systems, units with maker, model and hours, then the jobs and intervals. • Equipment replaced: record a replaced unit or part, why and what changed, signed. The monthly and round reports now list defects put right and equipment replaced.
More







