
PEG: Project Execution Graph
Project Execution Graph
0 ratings
Free
Rating summary
About
PEG is Project Execution Graph: a field workspace that connects equipment, schedules, and work information for invited project teams.
SEE THE PLAN
Browse scheduled equipment and its planned stages. Search the inventory and filter by data hall, lineup, division, or assigned person.
OPEN THE EQUIPMENT RECORD
Review an item's status, planned dates, work instructions, and recorded physical connections. Navigate between related equipment without losing the context of the work.
PREPARE FOR THE FIELD
Download equipment and open the work you need before going offline. Save field updates locally, then submit them when connected. Pending and accepted updates remain distinct.
KEEP THE TEAM INFORMED
Authorized planned stage-date changes and accepted field updates use the shared project service. Advanced CPM scenarios, connection editing, and administration remain in the web workspace.
PEG requires an enabled project account and PEG access provided by your project administrator. Available information and actions depend on your permissions. Documents and media are not included in offline downloads in this version.
Show more
What's New in PEG
1.0.1
November 14, 2026
Update work across multiple equipment items at once. Select equipment from the schedule or inventory, choose work steps, and review a common progress update before saving. Apply one exact submittal revision to selected items with explicit coverage. Offline progress is saved on your device and checked again when it syncs.
More

