ProjectOffice OMDT Planner

ProjectOffice OMDT Planner

Plan backwards, layer by layer

0 ratings
Free

Rating summary

Details

Released
November 20, 2026
Updated
November 22, 2026

Features

ProjectOffice OMDT Planner screenshot #1 for iPhone
ProjectOffice OMDT Planner screenshot #2 for iPhone
ProjectOffice OMDT Planner screenshot #3 for iPhone
ProjectOffice OMDT Planner screenshot #4 for iPhone
ProjectOffice OMDT Planner screenshot #5 for iPhone
iphone
ipad
🖼️Get Icon
Icons↘︎

About

Plan backwards from the date that matters. OMDT Planner builds a plan in four layers, the way the OMDT Planning Standard teaches it: • Objectives: what must this project achieve? 3 to 5 results you can measure, each with a date. • Milestones: how do you know you are on track? 2 to 4 per objective, never more than four weeks apart. • Deliverables: what must exist? Things you produce, each with one owner. • Tasks: what work makes them? Half a day to two weeks each. BUILD IT YOUR WAY • On iPad and Mac, the board: drag a new objective, milestone, deliverable or task onto your plan and move cards around. Each objective has its own colour. Set cards aside in the parking lot and drag them back when you need them. • Links: say what comes after what. Drag from one card to another, or pick from a list on iPhone. The app refuses a link that would make a loop and says why. • Workshop: put the board on a big screen and build the plan with your team, phase by phase. • Guide me: one question at a time, from your results down to the work. • The list: type an outline as fast as you think. Return for the next line, Tab to go one level deeper. • Bring in a plan from Microsoft Project, or paste an outline from an email. IT CHECKS AS YOU GO Every card says, in plain words, which rule is not met yet: an objective without a number, five weeks without a milestone, a deliverable without an owner, a task that should be a deliverable. A next-step line tells you what to do, and Check this plan scores the whole plan out of 100. FIVE WAYS TO SEE IT Board, List, Calendar, Tree and Timeline, with links and the critical path. Status follows the work: a milestone with a late deliverable is at risk, and late when that deliverable is on the critical path; work waiting on something late is at risk too. Dates never move by themselves: when a change breaks a link, Move later work pushes the later work just as far as it needs. SHARE IT Save a PDF to print or mail, send the plan file to a colleague, or, if your organisation runs ProjectOffice, send the plan straight into a project. Free, no account, no ads, no tracking. Your plans stay on your device. Three example plans, two from the course, show how it is done. Learn the method in the OMDT Planning Standard course at projectoffice.com/courses.
Show more
+2

What's New in ProjectOffice OMDT Planner

1.0.1

November 22, 2026

Link lines - The Board, List, Tree and Timeline now draw a line from each card to the card that comes after it. Red dashed means the dates break a link; orange shows the chain of the card you chose. - Switch the lines off or on in the ... menu > View. - When you drag a card on the board, its lines follow it. - Cards on the board have a light outline so they stand apart.

More

Developer apps