
Slateworks
Scheduling & field reports
About
What's New in Slateworks
1.2.14
October 5, 2026
THE DAY, ON ONE PAGE • Tap a job on Today to open its day: the site map on top (tap for directions, swipe to the takeoff drawing), then the work, crew, equipment and materials. • Edit day holds the changes (move it, push the job back, take it off the schedule), so reading the day never changes it by accident. DAILY REPORTS • Each task shows the day's planned amount right in its heading. • Equipment hours: a slider for each piece of equipment, starting at the shift's full day. • Leave a planned task blank and the app asks once before it files ("Nothing placed on Sealcoat today?"). PLANNING ON THE IPAD • Place days on the Board or Month without leaving Plan. • A fully scheduled job shows its site map and every day in order, subcontractor days included. • On an iPad on its side, the site map and the takeoff sit side by side. SCHEDULING • Two crews can work the same task on the same day; when a crew reports short, the office decides what happens to the rest. • Subcontractor days get their own row on the Board, with a day count per sub. • Board and Month keep their headers in place while you scroll. PLUS • Materials, quantities and hours read the same whole numbers everywhere. • Many smaller fixes from field testing on iPhone and iPad.
More




