
About
What's New in Stairwell 13
1.0.1
November 11, 2026
• A new way out: the basement blast door now opens with a single turn of the valve wheel, and the service passage leads to a proper street door. You'll know when you're ready to leave. • Rain you can hear at the windows. Real recorded rain and thunder, and the music now plays on through the storm. • Lights no longer shine through walls, and a few stray lamps that didn't belong are gone. • Bathroom mirrors now reflect, and kitchens have proper taps. • Flat entrance doors no longer block the hallway when open. • Torn wallpaper no longer covers pictures, mirrors or wall carpets. • Cleaner lift landings: the floor number and the floor display sit where they should. • Many smaller fixes to rooms, radiators and furniture.
More



