WBS Reviews: Is It Legit?

Customer Experience

Positive experience80.0% of reviews
Neutral4.0% of reviews
Negative experience16.0% of reviews

~ Based on 25 written reviews from the US App Store.

Is WBS Safe?

WBS - Project Work Breakdown appears safe based on user ratings. AppsHunter Safety Score for WBS is 91/100.

This assessment is based on 147 user ratings, with an App Store average of 4.7/5.

Safety Analysis

93.7% of ratings point to a safe experience
4.9% of ratings suggest some concerns
1.4% of ratings point to a risky experience

~ Based on 142 App Store ratings for WBS.

Is WBS Legit?

WBS - Project Work Breakdown appears to be a legitimate app. AppsHunter Legitimacy Score for WBS is 85/100.

Based on 85 of 100 points across 7 verification signals from App Store and developer data.

Top reviews

No good way to print

You should be able to select print like any other app, but that’s not available. The best you can do is export to an Excel file and then import it to a numbers file and then print it. ALSO no way to enter actual hours to determine actual cost

No good way to print

You should be able to select print like any other app, but that’s not available. The best you can do is export to an Excel file and then import it to a numbers file and then print it.

What the ??

No reel cost, no profits or %profit…you can literally do this on a pieces of paper or in note !!
Can I get reimburse?

Great Brainstorming Tool for a WBS!

So easy to just start listing tasks in a hierarchy. Then go back and add tentative end dates and cost estimates for labour and materials that get totalled up to the top task.
Flip to list view for a nice layout of the work and pick missing tasks. Then back to chart view to fix things up. So easy. Got my project outline and cost estimate down in under an hour!
Show more

Um excelente programa

É um recurso muito bom, apenas deveria ter também em português.

Bottom chopped off on iPad Pro 11” widescreen

Hello Team,

I’ve just purchased WBS app for iPad and noticed that the bottom of the screen is chopped off on iPad Pro 11” widescreen format when I select an item. The menu on the bottom is chopped off and I’m not able to fully use the app. Please optimize the app for 11” widescreen format and release an update ASAP.

FYI, the new iPad 10.9” is also widescreen and may have similar issue. Also, your other apps may have similar issues with widescreens.

2. It badly needs drag and drop boxes across columns in the layout screen. Currently, it seems deleting and re-adding the boxes is the only way to reorganize.

3. Category is not available for some boxes.

Great app, will give 5 stars on resolving these issues.
Show more

Excellent Program

This program is a valuable asset to and Project Management Suite. The program makes creation of a WBS an easy task as it should be.

Worthwhile

This is a terrific app that makes short work of producing a work breakdown structure (WBS). I admit, I was sceptical, but I took the chance and I’m glad I did - I bought the package that included the project planning and org chart.

I literally copied cells from Excel and pasted them into the bulk insert feature in this app then very quickly and easily converted it into the structure I was after. It has support for iCloud Drive, which is very important to me, isn’t subscription based (also important) and appears to have quite good input controls to prevent errors. It’s just a well designed and assembled app.

The only minor criticism I have is that some of the English in the app isn’t correct, which may be down to the developers language being something other than English. Not a big problem.

Great job to the developers and I look forward to where the app goes. I am going to look at buying the Mac version too.
Show more

Great app. Easy and practical

Wish I could have discovered this sooner!

Not sure if the app is still supported

I purchased a suite of these apps 3 in total. They were helpful and were fairly well suited to the film and tv projects I work on. I had thought the developers would continue to refine how well the apps performed.

So after a break I had several new projects to manage and started with the WBS app. Unfortunately the icon allocation function no longer works...and alas the developers website has disappeared from the web. I have been duped, so buyer beware.
Show more

Well Done

This is a great tool. Almost perfect. I’d love keyboard shortcuts, but this tool is great! Keep up the great work developer!

Powerful and Flexible

A surprisingly powerful tool that supports a robust and dynamic project planning phase. Changes and adjustments are easy to make, budgets are quickly defined, and it has pretty seamless integration with the other apps in the package to create the final plan. Well worth the investment. Paid back the first time.
Show more

Not Happy

One understands that having spent time and money to develop an App the developer would like to maximize their returns on investment.

However, breaking up what should be a single App into 3 and even selling them separately on different platforms ( IPad & Iphone) seems like taking it too far and may even considered to be bordering on greed.

Together the three Apps of Goals, WBS and QuickPlan are useful but the should all be one App. Set the goals, break the structure down and the plan them. The goals App by itself is useless. QuickPlan, to a point is okay. But they should all be one and same for all platforms.
Show more

CEO at UMP

Pretty good app for me and telling to my team to try it and see if they also like it, it's something which I do not hesitate to share.

Brilliant

Brilliant app, simple to use, excellent support, good value, best I've found

What I've been looking for

Compatible with desktop applications, e.g. Excel. Let's me organize and structure work efforts easily and quickly.

Great app for planning from scratch

Easy to use and a feature set that has left me wanting for nothing. Great app

Excellent work breakdown software

Easy-to-use intuitive interface that is not cluttered with too many bells and whistles.

Finally...a great planning app for iPad!

Organization is the key to success and so many apps fail to have one integrated approach. This app allows you to completely organize and schedule goals, projects and even mind maps to help you reach your potential. Great app!

Outstanding app

Overall I'm very happy with this app, however I'd like to see more colors for the diagram boxes, that could be with a color picker or more color options.

Please improve that and I'll update my review.