Construction Change Order App vs Addressed Envelope Designer
Price, ratings, monetisation and update history for both apps, side by side โ with what reviewers say about each.
Construction Change Order App
Streamline construction change order requests with this app. It allows for quick creation, supervisor review, and tracking of feedback. Features include labor/equipment details, document uploads, calculations, and offline/online functionality.
- Create construction change orders on the go
- Offline and online work capability
- Save and sync orders across devices
- Track order statuses and supervisor feedback
- Perform specific cost calculations
- Share PDF files and upload custom forms
Read full descriptionHide full description
14-day free trial. Construction Change Order App was specifically designed for employees working in the construction industry to create quick construction change order requests and provide them to selected supervisors for reviews. The app allows users to instantly fill in specific details including information about labor, equipment, parts, construction sites, date and timestamps, upload PDF documents, take pictures, perform specific calculations etc. The app can be 100% customized by Snappii. With the help of the Construction Change Order App workers can create change orders on the spots, make a list of supervisors, assign orders to them, track supervisor's feedback and proposed changes in case of rejections. Employees can easily track if their order was accepted or denied and re-make orders on demand. Due to the in-built calculator it is simple to estimate total hours and costs needed to complete a particular project. That definitely saves time and expenses as well as improves accuracy and eliminates paperwork. Any order will be securely stored on user's device and can be emailed, uploaded to cloud drives or printed out as a PDF form. Moreover, users can upload their own fillable PDF forms to collect specific information as an additional option. The uploaded files will be saved into the library of templates that can be re-used multiple times and shared. Construction Change Order App will enable users to: - make construction changes orders on the go - work offline and online - save collected orders on a device - sync completed orders across multiple devices - track order statuses - remake orders on demand - make specific calculations - share PDF files - add supervisors - make reviews and comment on them - upload custom PDF forms - custom search by orders By downloading, you agree to the Terms of Use at https://www.snappii.com/terms-of-service and privacy policy at https://www.snappii.com/policy After the free trial, you can get unlimited number of form submissions by subscribing via an optional In-App Purchase. Subscribe from your device and access these services via mobile app.
Addressed Envelope Designer
Design and print custom mailing envelopes with personalized sender and recipient addresses. Offers extensive customization for fonts, colors, images, and backgrounds, supporting various envelope standards and sizes. Includes postal barcode generation and contact management for efficient mailings.
- Customizable address styling (font, color, images)
- Support for 160 envelope sizes and 3 standards
- USPS Intelligent Mail postal barcode (IMb)
- Address list management (import, export, save)
- Save and restore envelope designs
- Print to AirPrint, save as PDF, or email
Read full descriptionHide full description
Design custom addressed envelopes: select from various sender and recipient address templates and custom stylize each address label. Printed envelope may contain sender address only, recipient address only or both. Features: * Supports 3 envelope standards: ISO, JSO and North American. * Supports 160 envelope sizes compatible with business and home inkjet/laser printers. * Specify custom envelopes whose size does not match any of the standard envelopes. * Stylize sender and recipient address label separately: - First line and remaining address lines can have a different font, font type and font color. - Select images from photos or supplied clip art. - Select monogram's font, letter and color, and optionally encase in a circle or oval frame. - Change the color and thickness of a line. - Add a background: color, photo or pattern. - Add a colored border: surround, top-bottom or left-right sides. - Include a USPS Intelligent Mail postal barcode (IMb) on printed envelope. Control where the barcode is placed. * Enter sender address manually or select from contacts. * Build a list of recipient addresses by entering them manually, selecting contacts with addresses, selecting a saved list and/or importing addresses from a CSV spreadsheet. * Manage address list: delete or edit an address, print list, export list as a CSV file, save address list to device and clear list. * Specify repetition counts for sender and recipient addresses. * Review envelopes for accuracy before printing. * Print outlined envelopes on paper and overlay an actual envelope to check if addresses positioned correctly. * Print envelopes to AirPrint enabled printers, save to a PDF file for printing later or e-mail PDF file as an attachment. * Printer options: Envelope's Face Placement, Envelope's Feed Position and Seal Flap's Direction. * Save envelope design to device and restore anytime. * Quick Guide provides a quick way to learn how to use the app. * Quick Tour of app that demonstrates its features and how to use them; viewable on-demand. * Detailed User Guide on how to use the app; includes a list of Frequently Ask Questions (FAQs). * Help Tips for each design sub-step to guide and remind user how to proceed. * Ability to send e-mail to the developer to report an issue and get back a solution, ask usage questions and/or make improvement suggestions. * Optionally request to rate the app in the App Store. The app's Privacy Policy is available at http://verusapps.com/index.php/privacy-policy-for-addressed-envelope-designer/
Screenshots
Verdict
The clearest difference is price: Construction Change Order App at Free against Addressed Envelope Designer's $4.99. Construction Change Order App also leads on device support (3 vs 1) and iOS requirement (14.0 vs 16.6). Addressed Envelope Designer's advantage is in-app purchases (none vs 3) and ads (none vs shown). On update cadence there is nothing between them.
Scored on Price ยท Rating ยท Positive reviews ยท Number of ratings ยท Update frequency ยท Ads ยท In-app purchases ยท Monetization ยท Best chart rank ยท Devices ยท Requires iOS
Construction Change Order App is free to download; Addressed Envelope Designer costs $4.99 up front. Construction Change Order App sells 3 in-app purchases, starting at $15.99 per month. Addressed Envelope Designer asks for nothing beyond the download.
Construction Change Order App ships an update every 4 months, Addressed Envelope Designer every 8 months. The most recent releases landed on November 1, 2026 and November 2, 2026 respectively.
| Parameter | Construction Change Order App | Addressed Envelope Designer |
|---|---|---|
| Price | Free โ better | $4.99 |
| Positive reviews | 0.0% of reviews | 28.6% of reviews โ better |
| Update frequency | Every 4 months โ better | Every 8 months |
| Ads | Yes | No โ better |
| In-app purchases | Yes | No โ better |
| Monetization | Free with in-app purchases โ better | Paid |
| Devices | iPhone, iPad, iPod โ better | iPad |
| Requires iOS | 14.0 โ better | 16.6 |
| Further details โ not scored | ||
| Size | 40 MB | 112 MB |
| Age rating | 4+ | 4+ |
| Developer | Snappii Corporation | Gilbert Hansen |
Customer experience
Construction Change Order App
Addressed Envelope Designer
In-app purchases
Construction Change Order App
- Monthly Subscription14 Days trial$15.991 Month
- Annual Subscription14 Days trial$159.991 Year
- Ad removal$0.99
Addressed Envelope Designer
No in-app purchases
Questions
Is Construction Change Order App free?
Is Addressed Envelope Designer free?
Do Construction Change Order App or Addressed Envelope Designer have ads?
Which is updated more often, Construction Change Order App or Addressed Envelope Designer?
Other comparisons











