Comparison

Earned Value Management vs Don't Panic

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

Earned Value Management

A pocket reference for Department of Defense professionals on Earned Value Management. It offers clear guidelines, an alphabetical list of EVM equations with variable definitions, and built-in calculators to simplify complex math.

Highlights
  • DoD EVM guidelines
  • Alphabetical EVM equations
  • Variable definitions
  • EVM equation calculators
  • DoD EVM community links
Features
Read full description

This app provides a handy pocket reference for engineers, logisticians and program managers involved in the Department of Defense's Earned Value Management processes. Features include: *Easy-to-understand DoD EVM guidelines *EVM equations listed alphabetically, with all variables defined *EVM equation calculators. Let us do the math for you! *Links to connect you to the larger DoD EVM community All ThinChip Software apps are now available free of charge.

About

Don't Panic

Features
Read full description

Don't Panic! is a calm, honest preparedness companion for ordinary people who want to be a little more ready — without becoming full-time preppers. No fear-mongering. No accounts. No tracking. Everything works offline, because the moment you actually need this, the network may be the first thing to go. WHAT'S INSIDE • Loadout — a practical bug-out bag checklist across five tiers (everyday carry, go-bag, home, car, documents). Track what's packed and what's missing, per person. • Field Manual — short, no-nonsense guides on water, food, shelter, warmth, communications, power, first aid, and more. Drawn from public sources (Ready.gov, FEMA, CDC, American Red Cross) with attribution. • Protocols — first-hour decision trees for the situations that matter: earthquake, fire, evacuation, power outage, chemical hazard, severe weather, and others. Clear steps when there's no time to read. WHY IT'S DIFFERENT • Offline-first — all content ships inside the app. No signal required. • Privacy by design — no sign-up, no analytics, no data leaves your device. • Calm tone — informed, not alarmed. Preparedness should lower your anxiety, not raise it. • Honest — general reference with sources cited, never a substitute for professional or emergency services. Don't Panic! won't predict the future. It just makes sure that if an ordinary bad day turns into an unusual one, you've already done the easy 80%. In a real emergency, always call your local emergency number first.

Screenshots

Earned Value Management4 screens
Don't Panic4 screens

Verdict

The call

The clearest difference is update cadence: Don't Panic at every 3 months against Earned Value Management's every 7 months. Don't Panic also leads on device support (3 vs 1) and iOS requirement (15.0 vs 26.0). On price, ads and in-app purchases there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. Neither carries in-app purchases, so what you see is what you pay.

UpkeepUpdate frequency

Earned Value Management ships an update every 7 months, Don't Panic every 3 months. The most recent releases landed on November 2, 2026 and October 31, 2026 respectively.

Scorecard3 real differences · 6 level
Earned Value Management versus Don't Panic: the parameters behind the verdict, then further details
ParameterEarned Value ManagementDon't Panic
PriceFreeFree
Rating5.0 (3 ratings) — better—
Number of ratings3 — better—
Update frequencyEvery 7 monthsEvery 3 months — better
AdsNoNo
In-app purchasesNoNo
MonetizationFree—
DevicesiPhoneiPhone, iPad, iPod — better
Requires iOS26.015.0 — better
Further details — not scored
Size45 MB16 MB
Age rating4+12+
DeveloperRussell ShannonIvan Shestakov

In-app purchases

None

Earned Value Management

No in-app purchases

None

Don't Panic

No in-app purchases

Questions

Is Earned Value Management free?
Earned Value Management is free to download, with no in-app purchases.
Is Don't Panic free?
Don't Panic is free to download, with no in-app purchases.
Do Earned Value Management or Don't Panic have ads?
Neither Earned Value Management nor Don't Panic shows ads.
Which is updated more often, Earned Value Management or Don't Panic?
Earned Value Management ships an update every 7 months, and Don't Panic every 3 months. Most recently, Earned Value Management was updated on November 2, 2026 and Don't Panic on October 31, 2026.

Other comparisons