Comparison

MoreFont vs Shift Rail

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

MoreFont

Easily install custom fonts on your iPhone and iPad to use across various applications. Choose from a built-in collection or import your own font files. Enjoy a seamless font management experience with features like search, filtering, and uninstallation.

Highlights
  • Tap to install fonts
  • Import custom font files
  • Browse Google Fonts
  • Search and filter fonts
  • Uninstall fonts
  • Full iPad support
Features
Read full description

Fonts for every app, in a tap. MoreFont installs fonts on your iPhone and iPad so you can use them in any app that supports custom fonts. TWO WAYS TO INSTALL • Tap to install. Pick a font from the built-in collection and it's ready to use. No profile, no setup. • Bring your own. Import font files from the Files app or browse Google Fonts right in the app, then install them all at once with a profile. Fonts installed this way stay even if you delete MoreFont. FEATURES • Search fonts by name • Filter by language, or show installed fonts only • Uninstall fonts from the app • Color themes • Full iPad support, including multitasking WORKS WITH Pages, Keynote, Numbers, GoodNotes, Photoshop, Illustrator and any other app that uses the fonts installed on your device. PREMIUM Install unlimited fonts and remove ads. Buy once, use forever. Questions or font requests: support@daymore.com

About

Shift Rail

Read full description

An ad-free shift calendar that shows today's shift the moment you open it. ROSTER Pick your rotation and tap which shift today is — the whole month fills in, no start date to work out. Start from 2-shift, 3-shift, day–night–off–rest, 24-hour duty or weekday presets, or build your own rotation of 2 to 28 days. • A month calendar with day, evening, night, duty, off and rest days in their own colors, starting on your device's first weekday • Tap a date to change just that day: leave, a swapped shift, cover • Monthly totals, such as D 10 · N 10 · Off 5 · R 6 • Today, tomorrow and your next shift at the top of the app Saving, viewing and changing days in a roster works without Pro. ALARMS FROM YOUR ROSTER (PRO, FIRST 7 DAYS FREE TO TRY) Tap "Set alarms from this roster" and Shift Rail sets each date's alarms for that day's shift, 28 days ahead. The first time, you can try them for 7 days without Pro: the days left show on the first screen, and the alarms stop when the trial ends. The roster is the source: change a day and that day's alarms change too. When fewer than seven days are left, opening the app quietly tops them up. SHARE THE MONTH OR EXPORT A CALENDAR FILE (PRO) Send an image with the roster's name, month, calendar and totals through Messages, Photos and more, or export three months as a calendar file (.ics) for other calendar apps. Try each three times without Pro. ALARM ROUTINES FOR A SHIFTED DAY • Save separate routines for workdays, workouts, weekends, or shifts • Move a routine from 60 minutes earlier to 90 minutes later, comparing every time before applying • Set one alarm to a target time and preview the whole routine moving with it • Choose the system sound or one of four original Shift Rail sounds CAREFUL BY DESIGN Shift Rail uses Apple's AlarmKit framework to schedule its alarms. It checks the resulting schedule after a change. If the schedule needs attention, the app shows a repair state instead of claiming that everything worked. OPTIONAL PRO A one-time Pro purchase sets alarms from your roster, shares the month as an image, and saves named target-time plans such as Early shift or School run. There is no subscription. All original alarm features and rosters work without Pro, and rosters with alarms set and saved plans stay readable, usable and deletable if Pro access ends. IMPORTANT No ads, no sign-in, no server. Shift Rail manages only alarms created inside Shift Rail; it does not change alarms in Apple's Clock app. Alarm access is required. Roster alarms are scheduled up to 80 at a time, so a roster with many alarms covers fewer days. Vibration and volume follow iPhone system settings, and delivery remains subject to iOS and device settings. Rosters and routines stay on this iPhone. English and Korean are included.

Screenshots

MoreFont4 screens
Shift Rail4 screens

Verdict

The call

The clearest difference is ads: Shift Rail at none against MoreFont's shown. Shift Rail also leads on update cadence (every 10 days vs every 2 months). On price, in-app purchases, device support and iOS requirement there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. MoreFont sells 1 one-off in-app purchase and Shift Rail sells 2 one-off in-app purchases. Whichever you choose, the download price is not the number that matters.

UpkeepUpdate frequency

MoreFont ships an update every 2 months, Shift Rail every 10 days. The most recent releases landed on November 14, 2026 and November 13, 2026 respectively.

Scorecard2 real differences · 8 level
MoreFont versus Shift Rail: the parameters behind the verdict, then further details
ParameterMoreFontShift Rail
PriceFreeFree
Rating4.5 (40 ratings) — better—
Positive reviews26.7% of reviews—
Number of ratings40 — better—
Update frequencyEvery 2 monthsEvery 10 days — better
AdsYesNo — better
In-app purchasesYesYes
MonetizationFree with in-app purchases—
DevicesiPhone, iPad — betteriPhone
Requires iOS26.026.0
Further details — not scored
Size8 MB4 MB
Age rating4+4+
DeveloperDayMore Corp.YEONWOO KIM

In-app purchases

1 purchases

MoreFont

One-time1
  • Premium$9.99
2 purchases

Shift Rail

One-time2
  • 7-Day Alarm TrialFree
  • Shift Rail Pro$0.99

Questions

Is MoreFont free?
MoreFont is free to download, with in-app purchases available.
Is Shift Rail free?
Shift Rail is free to download, with in-app purchases available.
Do MoreFont or Shift Rail have ads?
MoreFont shows ads; Shift Rail does not.
Which is updated more often, MoreFont or Shift Rail?
MoreFont ships an update every 2 months, and Shift Rail every 10 days. Most recently, MoreFont was updated on November 14, 2026 and Shift Rail on November 13, 2026.

Other comparisons