Comparison

Modul Pools vs Change Order Form

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

Modul Pools

Design your dream pool in augmented reality, receive instant price estimates, and digitally sign agreements. Track your entire pool construction project in real-time from start to finish.

Highlights
  • Augmented reality pool design
  • Instant price estimates
  • Digital agreement signing
  • Real-time project tracking
  • Visualize materials and finishes
Features
Read full description

Modul Pools puts your entire pool build in the palm of your hand. Design your dream pool in augmented reality, get an instant price estimate, sign your agreement digitally, and track every phase of your build in real time — from contract signing to final inspection. Design Visualize your custom pool in AR before a single shovel hits the ground. Choose materials, shapes, and finishes to see exactly what your backyard will look like. Price Get a transparent, itemized estimate instantly. No waiting, no back and forth. Sign Review and sign your construction agreement directly in the app. Your signed contract is submitted instantly and stored securely. Track Follow your build from contract to completion with a live timeline. See exactly where your project stands, review approved documents, and stay informed every step of the way. Built exclusively for Modul Pools customers.

About

Change Order Form

Features
Read full description

Get paid for the work nobody wrote down. Extra work starts with someone on site saying "just do it, we'll sort the paperwork later". Months later the paperwork is the argument. ChangeProof turns that moment into a priced, signed PDF before you leave the job. SIXTY SECONDS, ON SITE • Describe the extra work and why it sits outside the contract • Name the person who authorized it — the field that decides who pays • Add labor: who, what trade, hours, rate, overtime as its own line • Add materials and equipment, with markup if your contract allows it • Attach photos of what you actually did • Get the client or superintendent to sign on the screen • Export one PDF and send it THE TOTAL IS THE POINT Every line adds up as you type it, so the amount is on screen while the person who approved the work is still standing next to you. No spreadsheet afterwards, no rebuilding it from memory on Sunday night. BUILT FOR THE FIELD • Works fully offline — no signal needed • No account, no login • Your first tag is free • Tags stay on your iPhone • Sequential tag numbers, so you can point to T-014 and everyone knows which one WHY THIS DOCUMENT MATTERS Two thirds of specialty contractors still write time and materials on paper tags. Those tags get lost, and the work gets written off. A tag with the labor priced, the photos attached and both signatures on it is a different conversation with the general contractor — one you can send the same day. PRICING ChangeProof is free to download, and your first PDF export is free. After that, choose one of: • Annual Unlimited — unlimited exports, an auto-renewable subscription billed every year • Monthly Unlimited — unlimited exports, an auto-renewable subscription billed every month • Lifetime Unlimited — unlimited exports, one-time purchase • Single PDF Export — one PDF export, one-time purchase Prices for your country are shown in the app before you buy. Payment is charged to your Apple Account at confirmation of purchase. The subscription renews automatically unless it is canceled at least 24 hours before the end of the current period; your account is charged for renewal within 24 hours before the period ends. Manage or cancel it in Settings > Apple Account > Subscriptions. ChangeProof is documentation software. It is not legal, contractual, or accounting advice. Read your contract before relying on any record. Terms of Use (EULA): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Privacy Policy: https://depositproof-reports.vercel.app/changeproof-privacy

Screenshots

Modul Pools4 screens
Change Order Form4 screens

Verdict

The call

The clearest difference is in-app purchases: Modul Pools at none against Change Order Form's 5. Modul Pools also leads on device support (3 vs 1) and iOS requirement (15.1 vs 17.0). On price, update cadence and ads there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. Change Order Form sells 5 in-app purchases, starting at $9.99 per month. Modul Pools asks for nothing beyond the download.

UpkeepUpdate frequency

Modul Pools ships an update every 4 days, Change Order Form weekly. The most recent releases landed on November 18, 2026 and November 13, 2026 respectively.

Scorecard3 real differences · 7 level
Modul Pools versus Change Order Form: the parameters behind the verdict, then further details
ParameterModul PoolsChange Order Form
PriceFreeFree
Rating4.8 (28 ratings) — better—
Positive reviews100.0% of reviews—
Number of ratings28 — better—
Update frequencyEvery 4 days — betterWeekly
AdsNoNo
In-app purchasesNo — betterYes
MonetizationFree—
DevicesiPhone, iPad, iPod — betteriPhone
Requires iOS15.1 — better17.0
Further details — not scored
Size367 MB1 MB
Age rating4+4+
DeveloperKeanu MonterrosoMatvii Kaushynskyi

In-app purchases

None

Modul Pools

No in-app purchases

5 purchases

Change Order Form

Subscriptions2
  • Monthly Unlimited$9.991 Month
  • Annual Unlimited$79.991 Year
One-time3
  • Single PDF Export$9.99
  • 5 Tag Pack$19.99
  • Lifetime Unlimited$149.99

Questions

Is Modul Pools free?
Modul Pools is free to download, with no in-app purchases.
Is Change Order Form free?
Change Order Form is free to download, with in-app purchases available.
Do Modul Pools or Change Order Form have ads?
Neither Modul Pools nor Change Order Form shows ads.
Which is updated more often, Modul Pools or Change Order Form?
Modul Pools ships an update every 4 days, and Change Order Form weekly. Most recently, Modul Pools was updated on November 18, 2026 and Change Order Form on November 13, 2026.

Other comparisons