Comparison

BIM 360 Layout vs 4M Plan

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

BIM 360 Layout

This app connects construction models to the field layout process, increasing job site productivity and accuracy. It guides users to exact point locations for staking and verification using compatible total station hardware. Models and point data can be downloaded for offline use.

Highlights
  • Connects model to field layout
  • Increases job site productivity
  • Improves accuracy of staked components
  • Guides users to exact point locations
  • Supports offline model and point data
  • Remote total station control
Read full description

The Autodesk® BIM 360™ Layout app for iOS and BIM 360™ web service provide vertical construction contractors the ability to connect the coordinated model to the field layout process, helping to increase job site productivity while improving the accuracy of staked or installed building components. The app synchronizes with your BIM 360 account to download and upload project models with point location coordinate detail. Once paired with a total station, BIM 360 Layout on your iPad™ guides the user to the exact location of those points on the job site for field staking and/or location verification activities. NOTE: The BIM 360 Layout app is currently directly compatible with the following positioning hardware: Topcon LN-100 3D Layout Navigator, Topcon DS-200i, Leica iCON robot 60, and Leica iCON robot 50. NOTE: The BIM 360 Layout app is currently compatible with the following positioning hardware when used in conjunction with a compatible BT Bridging device: Topcon LN-150 3D Layout Navigator, Topcon DS-200i/DS-200, Topcon GT and PS series, Sokkia SX and IX series, and Leica iCON robots 50, 60,70, and 80. ______________________ Share and Collaborate ◆ Share and assign layout points from within BIM 360 Glue Web to the BIM 360 Layout app ◆ Models and point data can be downloaded for offline use in the field ◆ Sync and share collected/as-built points from the app in the field with BIM 360 Glue web ◆ Upload models with layout points created in Autodesk Point Layout directly from AutoCAD, Revit and Navisworks into BIM360 Glue and sync with the BIM 360 Layout app Robotic Total Station Controller ◆ Seamless connection to total station hardware ◆ Control the total station remotely utilizing guide and point-turn functionality ◆ Step-by-step, guided total station set-up routine including coach marks for each feature User Interface and Navigation ◆ Select level and location in 2D, navigate directly to that location in 3D model view ◆ First person—immersive view of the building model as the user walks the jobsite ◆ Optimized views to see total station, prism, selected point and auto-zoom 2D & 3D viewing modes when nearing a point ______________________ Autodesk BIM 360 Layout mobile app is licensed under the following License and Services Agreement. Your download and/or use of the Autodesk BIM 360 Layout mobile app shall serve as your acknowledgement to the terms of this License and Services Agreement with respect to your use of the Autodesk BIM 360 Layout mobile app. Requirements: Requires iOS 12 or later.

About

4M Plan

Features
Read full description

4M Plan is a digital platform that helps you plan, track, and manage tasks

Screenshots

4M Plan3 screens

Verdict

The call

The clearest difference is update cadence: 4M Plan at every 9 days against BIM 360 Layout's every 2 months. BIM 360 Layout's advantage is iOS requirement (12.0 vs 17.0). On price, ads, in-app purchases and device support there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. Neither carries in-app purchases, so what you see is what you pay.

UpkeepUpdate frequency

BIM 360 Layout ships an update every 2 months, 4M Plan every 9 days. The most recent releases landed on June 11, 2026 and September 15, 2026 respectively.

Scorecard2 real differences · 8 level
BIM 360 Layout versus 4M Plan: the parameters behind the verdict, then further details
ParameterBIM 360 Layout4M Plan
PriceFreeFree
Rating3.7 (3 ratings) — better
Positive reviews0.0% of reviews
Number of ratings3 — better
Update frequencyEvery 2 monthsEvery 9 days — better
AdsNoNo
In-app purchasesNoNo
MonetizationFree
DevicesiPadiPhone, iPad — better
Requires iOS12.0 — better17.0
Further details — not scored
Size49 MB96 MB
Age rating4+4+
DeveloperAutodeskCutech Infocomm Solutions Ptd Ltd

In-app purchases

None

BIM 360 Layout

No in-app purchases

None

4M Plan

No in-app purchases

Questions

Is BIM 360 Layout free?
BIM 360 Layout is free to download, with no in-app purchases.
Is 4M Plan free?
4M Plan is free to download, with no in-app purchases.
Do BIM 360 Layout or 4M Plan have ads?
Neither BIM 360 Layout nor 4M Plan shows ads.
Which is updated more often, BIM 360 Layout or 4M Plan?
BIM 360 Layout ships an update every 2 months, and 4M Plan every 9 days. Most recently, BIM 360 Layout was updated on June 11, 2026 and 4M Plan on September 15, 2026.

Other comparisons