App with a lot of potential.
Once everything is setup, the metrics reporting is one of the best in the industry, with a floor by floor, unit by unit, space by space progress % breakdown.
The only downside is that the there is somewhat of a wait time before the checklist comes online (anywhere between 12 to 48 hours). So plan accordingly.



