Comparison

Army Engineer Guide vs Earned Value Management

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

Army Engineer Guide

This app provides essential engineering tools and references for military engineers. It offers unit converters, construction calculators, and planning resources designed for offline use in the field. Access field manuals and helpful links without ads or subscriptions.

Highlights
  • Unit Converters (Metric/US/Military)
  • Construction Calculators (Concrete, Lumber, Excavation, Sandbag)
  • Range Finder
  • Customizable Packing Lists
  • Field Notes Journal
  • Offline Access to Field References
Features
Read full description

Army Engineer Guide, first published in 2012, totally rebuilt and deployed for 2025 by our New School Army project. Army Engineer tools & reference, no ads, no subscriptions, no accounts and log ins, no data collection, just straight gas to get your Essayons On. ESSENTIAL ENGINEERING TOOLS: Unit Converters - Convert between metric and U.S. units for distance, weight, volume, temperature, area, pressure, and speed. Includes specialized military-specific conversions to support field operations. CONSTRUCTION SUPPORT: Concrete Calculator - Calculate concrete volume, bags, and weight for construction projects with precision. Support for rectangular, circular, and L-shaped designs. Lumber & Nails Calculator - Estimate materials needed for wooden structures. Plan efficiently and eliminate waste. Excavation Calculator - Calculate soil volume and equipment requirements for field fortifications and defensive positions. Sandbag Calculator - Sums up the number of sandbags needed to construct a sandbag wall and estimates the time required based on number of people and speed to fill a sandbag. Individual PLANNING: Range Finder - Visualize distances and ranges on tactical maps. Perfect for developing range estimation skills and planning defensive positions. Packing List - Create, customize and share detailed packing lists for engineering missions. Ensure your team has the right equipment every time. Journal - Document lessons learned and keep field notes organized in one secure location. ADDITIONAL RESOURCES: Field References - Quick access to FM 3-34 and other essential engineering references. Helpful Links - Curated web links for Engineers (schoolhouse, Army engineer Association and so on...). FEATURES THAT MATTER: - Zero cloud dependency - your data stays on your device - No account required - download and start immediately - Built-in sharing for calculations and plans - Designed for offline use in the field Perfect for Combat Engineers, Construction Engineers, and Engineer Leaders who need reliable, offline access to technical calculators and planning tools.

About

Earned Value Management

A pocket reference for Department of Defense professionals on Earned Value Management. It offers clear guidelines, an alphabetical list of EVM equations with variable definitions, and built-in calculators to simplify complex math.

Highlights
  • DoD EVM guidelines
  • Alphabetical EVM equations
  • Variable definitions
  • EVM equation calculators
  • DoD EVM community links
Features
Read full description

This app provides a handy pocket reference for engineers, logisticians and program managers involved in the Department of Defense's Earned Value Management processes. Features include: *Easy-to-understand DoD EVM guidelines *EVM equations listed alphabetically, with all variables defined *EVM equation calculators. Let us do the math for you! *Links to connect you to the larger DoD EVM community All ThinChip Software apps are now available free of charge.

Screenshots

Army Engineer Guide4 screens
Earned Value Management4 screens

Verdict

The call

The clearest difference is price: Earned Value Management at Free against Army Engineer Guide's $0.99. Army Engineer Guide's advantage is update cadence (every 3 months vs every 7 months) and device support (3 vs 1). On ads and in-app purchases there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Earned Value Management is free to download; Army Engineer Guide costs $0.99 up front. Neither carries in-app purchases, so what you see is what you pay.

UpkeepUpdate frequency

Army Engineer Guide ships an update every 3 months, Earned Value Management every 7 months. The most recent releases landed on November 6, 2026 and November 2, 2026 respectively.

Scorecard5 real differences · 5 level
Army Engineer Guide versus Earned Value Management: the parameters behind the verdict, then further details
ParameterArmy Engineer GuideEarned Value Management
Price$0.99Free — better
Rating—5.0 (3 ratings) — better
Positive reviews33.3% of reviews—
Number of ratings—3 — better
Update frequencyEvery 3 months — betterEvery 7 months
AdsNoNo
In-app purchasesNoNo
MonetizationPaidFree — better
DevicesiPhone, iPad, iPod — betteriPhone
Requires iOS12.0 — better26.0
Further details — not scored
Size38 MB45 MB
Age rating17+4+
DeveloperPolemics Applications LLCRussell Shannon

Customer experience

Army Engineer Guide

Written reviews6 reviews
Positive33.3%
Neutral33.3%
Negative33.3%

Earned Value Management

All ratings3 ratings
Positive100.0%
Neutral0.0%
Negative0.0%

In-app purchases

None

Army Engineer Guide

No in-app purchases

None

Earned Value Management

No in-app purchases

Questions

Is Army Engineer Guide free?
Army Engineer Guide costs $0.99, with no in-app purchases.
Is Earned Value Management free?
Earned Value Management is free to download, with no in-app purchases.
Do Army Engineer Guide or Earned Value Management have ads?
Neither Army Engineer Guide nor Earned Value Management shows ads.
Which is updated more often, Army Engineer Guide or Earned Value Management?
Army Engineer Guide ships an update every 3 months, and Earned Value Management every 7 months. Most recently, Army Engineer Guide was updated on November 6, 2026 and Earned Value Management on November 2, 2026.

Other comparisons