Comparison

CableCalc BS7671 vs Project Management Tools

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

CableCalc BS7671

This application performs comprehensive electrical cable calculations compliant with BS7671:2018(2024) standards. It checks for voltage drop, disconnection time, fault current, and overload data, generating detailed PDF reports. Supports single and three-phase calculations for various circuit types and includes extensive cable databases.

Highlights
  • BS7671:2018(2024) compliant calculations
  • Voltage drop, disconnection time, fault current checks
  • Single and three-phase calculations
  • Radial, ring, and sub main circuits
  • Detailed PDF report generation
  • Extensive cable and protective device database
  • Correction factor application
Read full description

CableCalc BS7671 is a cable evaluation program fully compliant with BS7671:2018(2024) Requirements for Electrical Installations IEE Wiring Regulations 18th Edition based on IEC/CENELEC Standards. Following the success of previous releases of CableCalc BS7671 over the past 20 years, CableCalc BS7671 has been re-designed for the iPad to provide a intuitive user interface with all the comprehensive features of the Windows software. CableCalc BS7671 will calculate and check for voltage drop, disconnection time, fault current, earth fault data, overload and short circuit data and will produce a detailed print-out for each calculation in PDF format which can be printed to an AirPort compatible printer or emailed. CableCalc BS7671 will perform both single and three-phase calculations for radial, ring and sub main circuits. CableCalc includes a full database of copper cables and generic protective devices and allows you to complete all information relevant to the calculation including any applicable correction factors for temperature, grouping etc. Energy let through values can be entered and calculations can be saved to load back in later. Cable types include: 70°C PVC Armoured & Non Armoured multicore & singles, Twin & earth, 6491x & 6181y Singles 90°C LSF Armoured singles & multicore, 6491b & 6181 Singles, Twin & earth, Flat 3 core & earth 90°C XLPE Armoured & Non Armoured singles & Multicore, 6491b & 6181xy singles FP100, FP200, FP200 Flex, FP400 and Fireforce PH30 Fire rated MICC PVC Sheath/Bare, Heavy & Light Duty CY, SY, YY 70°C PVC Flexible cable, 105°C Tri-Rated singles 60 & 90°C Rubber insulated flexible cable CableCalc is available in the english language only and all cable sizes are metric (mm). BS7671 is the standard for wiring regulations in the United Kingdom.

About

Project Management Tools

This app helps plan and execute projects on time with features like milestone tracking, bug reporting, task management, and timesheets. It provides visibility into team activities, progress, and potential missed targets. Monitor bugs, their status, and time spent on each task.

Highlights
  • Milestone tracking
  • Bug tracking
  • Task management
  • Document management
  • Timesheet logging
  • Progress monitoring
Features
Read full description

The Project Management Software App helps to plan and execute the project work on time with Milestone, Bug Tracking, Tasks, Documents, Timesheet and Pages features. The task manager feature offers to make complex work into smaller tasks. This task management software shows the progress for the actual work done and pending work. Using these Project Management Tools one can easily know various team members activities, milestones, and missed targets. The Bug Tracking feature shows all bugs and errors and current status whether it is fixed or not, who worked on it and more details. The Timesheet feature shows how much time spent on each task and current status.

Screenshots

Project Management Tools4 screens

Verdict

The call

The clearest difference is review sentiment: CableCalc BS7671 at 50% against Project Management Tools's 0%. CableCalc BS7671 also leads on ads (none vs shown). Project Management Tools's advantage is price (Free vs $149.99) and update cadence (every 2 months vs every 23 months). On in-app purchases and iOS requirement there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Project Management Tools is free to download; CableCalc BS7671 costs $149.99 up front. Neither carries in-app purchases, so what you see is what you pay.

UpkeepUpdate frequency

CableCalc BS7671 ships an update every 23 months, Project Management Tools every 2 months. The most recent releases landed on October 23, 2026 and October 24, 2026 respectively.

Scorecard6 real differences · 4 level
CableCalc BS7671 versus Project Management Tools: the parameters behind the verdict, then further details
ParameterCableCalc BS7671Project Management Tools
Price$149.99Free — better
Rating—3.8 (12 ratings) — better
Positive reviews50.0% of reviews — better0.0% of reviews
Number of ratings—12 — better
Update frequencyEvery 23 monthsEvery 2 months — better
AdsNo — betterYes
In-app purchasesNoNo
MonetizationPaidAd-supported — better
DevicesiPadiPhone, iPad, iPod — better
Requires iOS9.09.0
Further details — not scored
Size2 MB37 MB
Age rating4+4+
DeveloperCastline SystemsSentientIT Software Solution

Customer experience

CableCalc BS7671

Written reviews2 reviews
Positive50.0%
Neutral0.0%
Negative50.0%

Project Management Tools

All ratings11 ratings
Positive63.6%
Neutral0.0%
Negative36.4%
Written reviews2 reviews
Positive0.0%
Neutral0.0%
Negative100.0%

In-app purchases

None

CableCalc BS7671

No in-app purchases

None

Project Management Tools

No in-app purchases

Questions

Is CableCalc BS7671 free?
CableCalc BS7671 costs $149.99, with no in-app purchases.
Is Project Management Tools free?
Project Management Tools is free to download, with no in-app purchases.
Do CableCalc BS7671 or Project Management Tools have ads?
Project Management Tools shows ads; CableCalc BS7671 does not.
Which is updated more often, CableCalc BS7671 or Project Management Tools?
CableCalc BS7671 ships an update every 23 months, and Project Management Tools every 2 months. Most recently, CableCalc BS7671 was updated on October 23, 2026 and Project Management Tools on October 24, 2026.

Other comparisons