Comparison

AllBoards vs SKYGATE

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

AllBoards

Features
Read full description

Track flights, check live airport boards, and stay ahead of delays, gate changes, and arrivals with AllBoards. AllBoards brings live flight tracking and airport arrival and departure boards for 10,000+ airports into one clean app. Whether you're flying, checking an airport board, or waiting for someone to arrive, AllBoards gives you the information you need without the clutter. 100% free. No ads. No subscriptions. LIVE AIRPORT BOARDS Check live arrivals and departures for 10,000+ airports worldwide. Search by airport name, city, or IATA code and instantly see: arrivals and departures flight status gates and terminals scheduled and updated times delays and changes From JFK and LHR to DXB, CDG, FRA, EVN and thousands more. TRACK YOUR FLIGHTS Add a flight once and keep everything important in one place. Follow: departure and arrival status delays boarding information gate changes scheduled and actual times aircraft details No need to keep checking airline websites or airport boards. LIVE FLIGHT ALERTS Stay informed when something changes. AllBoards can notify you about important flight updates, including delays, gate changes, boarding and arrival status. Keep your flight information close without constantly reopening the app. DOOR-TO-DOOR ARRIVAL TIMELINE Landing isn't always the end of the journey. AllBoards combines your flight arrival with real-time routing to estimate the rest of your journey, including: touchdown time baggage claim timing airport exit estimate taxi or ride pickup time traffic-aware ETA to your hotel, home, or destination Get a realistic arrival estimate from landing to your door — not just a landing time. DESTINATION WEATHER See the weather for your destination around your expected arrival time. Check: temperature feels-like temperature wind humidity visibility Know what to expect before you step outside. TRAVEL HISTORY & STATS Keep track of your journeys over time. See: flights added airports visited total flight time travel achievements and badges Build your travel history as you fly. SIMPLE BY DESIGN AllBoards is built to keep flight information clear and easy to access. You get: clean dark interface fast airport search live flight information push notifications arrival sharing no ads no subscription no credit card required You can use AllBoards without an account, or create one to save flights and keep your travel history across devices. Every flight. One clean board. Privacy Policy: https://allboards.online/privacy.html Terms of Service: https://allboards.online/terms.html

About

SKYGATE

Features
Read full description

Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.

Screenshots

AllBoards4 screens
SKYGATE4 screens

Verdict

The call

The clearest difference is in-app purchases: AllBoards at none against SKYGATE's 2. SKYGATE's advantage is device support (6 vs 2). On price, update cadence, ads and iOS requirement there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. SKYGATE sells 2 in-app purchases, starting at $2.99 per month. AllBoards asks for nothing beyond the download.

UpkeepUpdate frequency

AllBoards ships an update every 6 days, SKYGATE weekly. The most recent releases landed on September 23, 2026 and September 26, 2026 respectively.

Scorecard2 real differences · 4 level
AllBoards versus SKYGATE: the parameters behind the verdict, then further details
ParameterAllBoardsSKYGATE
PriceFreeFree
Update frequencyEvery 6 days — betterWeekly
AdsNoNo
In-app purchasesNo — betterYes
DevicesiPhone, iPadiPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better
Requires iOS16.4 — better17.0
Further details — not scored
Size91 MB28 MB
Age rating12+4+
DeveloperSamvel OfliianHUGO ANATOLE PAUL MORICEAU

In-app purchases

None

AllBoards

No in-app purchases

2 purchases

SKYGATE

Subscriptions2
  • SKYGATE Premium Monthly3 Days trial$2.991 Month
  • SKYGATE Premium Annual3 Days trial$19.991 Year

Questions

Is AllBoards free?
AllBoards is free to download, with no in-app purchases.
Is SKYGATE free?
SKYGATE is free to download, with in-app purchases available.
Do AllBoards or SKYGATE have ads?
Neither AllBoards nor SKYGATE shows ads.
Which is updated more often, AllBoards or SKYGATE?
AllBoards ships an update every 6 days, and SKYGATE weekly. Most recently, AllBoards was updated on September 23, 2026 and SKYGATE on September 26, 2026.

Other comparisons