Comparison

شرفت vs SKYGATE

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

شرفت

Features
Read full description

تطبيق شرفت مساعدك الاساسي خلال سياحتك في المملكة العربية السعودية

About

SKYGATE

Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.

Highlights
  • Automatic compensation claim
  • Real-time flight tracking
  • Live gate and delay alerts
  • AI-powered passenger rights
  • Predictive delay scoring
  • Family and team flight sharing
Features
Read full description

Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.

Screenshots

شرفت4 screens
SKYGATE4 screens

Verdict

The call

The clearest difference is in-app purchases: شرفت at none against SKYGATE's 3. شرفت also leads on iOS requirement (15.6 vs 17.0). SKYGATE's advantage is device support (6 vs 2). On price and ads there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month. شرفت asks for nothing beyond the download.

Scorecard3 real differences · 5 level
شرفت versus SKYGATE: the parameters behind the verdict, then further details
ParameterشرفتSKYGATE
PriceFreeFree
Positive reviews—100.0% of reviews
Update frequency—Weekly
AdsNoNo
In-app purchasesNo — betterYes
Monetization—Freemium
DevicesiPhone, iPodiPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better
Requires iOS15.6 — better17.0
Further details — not scored
Size56 MB28 MB
Age rating17+4+
DeveloperEslam ShalabiHUGO ANATOLE PAUL MORICEAU

In-app purchases

None

شرفت

No in-app purchases

3 purchases

SKYGATE

Subscriptions3
  • SKYGATE Premium Monthly3 Days trial$2.991 Month
  • SKYGATE Premium Weekly$4.997 Days
  • SKYGATE Premium Annual3 Days trial$19.991 Year

Questions

Is شرفت free?
شرفت is free to download, with no in-app purchases.
Is SKYGATE free?
SKYGATE is free to download, with in-app purchases available.
Do شرفت or SKYGATE have ads?
Neither شرفت nor SKYGATE shows ads.

Other comparisons