Comparison

Flights. vs SKYGATE

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

Flights.

Features
Read full description

Flights. is a fast, minimal flight search tool built for travellers who want to find the best price — without the noise. SEARCH Type any IATA airport code (AMS, BCN, JFK…), pick a date, and hit search. Results show real fares with airline, times, duration and stops. VIEWS • Cheapest week — see the lowest price across 7 departure days at a glance • Month overview — browse an entire month of prices in a calendar grid • Heatmap — 6-week price heatmap to spot the cheapest travel window • Cheapest month — scan 6 months ahead to find the best month to fly • Weekend trips — instant view of this and next weekend fares DISCOVER & COMPARE • Discover — find where you can fly from your airport within budget • Compare routes — search multiple origin/destination pairs side by side • Alternative airports — automatically checks nearby airports for better deals PRICE TRACKING • Price alerts — set a target price and get notified when fares drop • Favourites — save routes and track their price history over time • Price level indicator — see whether current fares are low, typical or high Available in English and Dutch.

About

SKYGATE

Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.

Highlights
  • Automatic compensation claim
  • Real-time flight tracking
  • Live gate and delay alerts
  • AI-powered passenger rights
  • Predictive delay scoring
  • Family and team flight sharing
Features
Read full description

Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.

Screenshots

Flights.3 screens
SKYGATE4 screens

Verdict

The call

The clearest difference is in-app purchases: Flights. at none against SKYGATE's 3. SKYGATE's advantage is device support (6 vs 2). On price, update cadence, ads and iOS requirement there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month. Flights. asks for nothing beyond the download.

UpkeepUpdate frequency

Flights. ships an update every 10 days, SKYGATE weekly. The most recent releases landed on October 31, 2026 and November 3, 2026 respectively.

Scorecard2 real differences · 6 level
Flights. versus SKYGATE: the parameters behind the verdict, then further details
ParameterFlights.SKYGATE
PriceFreeFree
Positive reviews—100.0% of reviews
Update frequencyEvery 10 daysWeekly — better
AdsNoNo
In-app purchasesNo — betterYes
Monetization—Freemium
DevicesiPhone, iPadiPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better
Requires iOS16.0 — better17.0
Further details — not scored
Size20 MB28 MB
Age rating4+4+
DeveloperJosephus Fransiscus ZegersHUGO ANATOLE PAUL MORICEAU

In-app purchases

None

Flights.

No in-app purchases

3 purchases

SKYGATE

Subscriptions3
  • SKYGATE Premium Monthly3 Days trial$2.991 Month
  • SKYGATE Premium Weekly$4.997 Days
  • SKYGATE Premium Annual3 Days trial$19.991 Year

Questions

Is Flights. free?
Flights. is free to download, with no in-app purchases.
Is SKYGATE free?
SKYGATE is free to download, with in-app purchases available.
Do Flights. or SKYGATE have ads?
Neither Flights. nor SKYGATE shows ads.
Which is updated more often, Flights. or SKYGATE?
Flights. ships an update every 10 days, and SKYGATE weekly. Most recently, Flights. was updated on October 31, 2026 and SKYGATE on November 3, 2026.

Other comparisons