SKYGATE vs FlightPath
Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.
SKYGATE
Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.
- Automatic compensation claim
- Real-time flight tracking
- Live gate and delay alerts
- AI-powered passenger rights
- Predictive delay scoring
- Family and team flight sharing
Read full descriptionHide full description
Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.
FlightPath
Read full descriptionHide full description
FlightPath — Track Any Flight, Live. Ever waited at the airport wondering where a flight actually is? FlightPath puts every flight on a live world map, so you always know exactly where a plane is right now — its position, altitude, speed, and route from takeoff to touchdown. Whether you're picking someone up, catching a connection, or just love watching planes, FlightPath turns flight tracking into something simple, fast, and beautiful. - LIVE FLIGHT MAP Watch aircraft move across a real-time world map. See the flight path drawn from origin to destination, with the plane's current position updating as it flies. Pan freely or lock the camera to follow the aircraft. - REAL-TIME STATUS & TIMES Stay ahead with up-to-date departure and arrival times — scheduled, estimated, and actual. Know instantly if a flight is on time, delayed, boarding, en route, or landed. - GATES, TERMINALS & DETAILS See gate and terminal info, aircraft type, altitude, ground speed, and more — everything you need in one glance. - MODERN, CLEAN DESIGN A sleek dark interface built for clarity and speed, with smooth animations that make tracking a pleasure — not a chore. PERFECT FOR • Picking up friends and family from the airport • Frequent flyers managing connections • Travelers who want peace of mind before heading out • Aviation enthusiasts and plane spotters • Anyone tracking a loved one's journey Terms of Use - https://app.notion.com/p/Privacy-Policy-for-FlightPath-3b172dd3ff9a808f82cff4094b498cff?source=copy_link
Screenshots
Verdict
The clearest difference is in-app purchases: FlightPath at none against SKYGATE's 3. FlightPath also leads on iOS requirement (13.0 vs 17.0). SKYGATE's advantage is device support (6 vs 3). On price and ads there is nothing between them.
Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS
Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month. FlightPath asks for nothing beyond the download.
| Parameter | SKYGATE | FlightPath |
|---|---|---|
| Price | Free | Free |
| Positive reviews | 100.0% of reviews | — |
| Update frequency | Weekly | — |
| Ads | No | No |
| In-app purchases | Yes | No — better |
| Monetization | Freemium | — |
| Devices | iPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better | iPhone, iPad, iPod |
| Requires iOS | 17.0 | 13.0 — better |
| Further details — not scored | ||
| Size | 28 MB | 33 MB |
| Age rating | 4+ | 4+ |
| Developer | HUGO ANATOLE PAUL MORICEAU | Aryan Sood |
In-app purchases
SKYGATE
- SKYGATE Premium Monthly3 Days trial$2.991 Month
- SKYGATE Premium Weekly$4.997 Days
- SKYGATE Premium Annual3 Days trial$19.991 Year
FlightPath
No in-app purchases









