SKYGATE vs MODE 1090
Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.
SKYGATE
Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.
- Automatic compensation claim
- Real-time flight tracking
- Live gate and delay alerts
- AI-powered passenger rights
- Predictive delay scoring
- Family and team flight sharing
Read full descriptionHide full description
Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.
MODE 1090
Read full descriptionHide full description
Know what's flying overhead. Track aircraft live, point your iPhone at the sky and turn real sightings into your own aircraft collection. Start with live radar, scanning and collecting for free. No account needed to get started. YOUR SKY, LIVE • See nearby aircraft on a clear radar with altitude, speed and aircraft photos when available. • Explore the interactive flight map, browse the list of nearby aircraft and watch aircraft arriving at or departing from an airport. • Switch between aircraft silhouettes, ATC data blocks and a minimal radar view. SCAN IT. COLLECT IT. • Point your iPhone at an aircraft to find out what you're looking at. No photo upload needed. • Collect real sightings across aircraft types, airlines and registrations. Add notes and revisit your scan history. • See your collected aircraft on the map, complete daily missions, earn XP, level up and unlock achievements. • Share the hobby with friends and compare your progress. GET CLOSER WITH MODE 1090 PRO • Rotate, zoom and explore available 3D aircraft models and liveries. • Search live aircraft worldwide by callsign, registration or ICAO code, then follow a flight on the map. • Discover flight routes when available, save more aircraft favorites and revisit flight history. • Keep airport spotting in view with Live Activities on supported iPhones, where available. • Enjoy radar without the inactivity pause, spoken aviation callouts in English, custom radar colors and app icons. • Export your sighting notes for use beyond the app. ON YOUR PHONE, TABLET AND WRIST Enjoy spotting on iPhone and iPad, with a live radar on Apple Watch. With an optional account, you can sync your collection for free between iPhone and iPad. You can also export your collection data. No ads. Camera images stay on your device. Flight coverage, routes and model availability vary. MODE 1090 is for plane spotting and observation, not navigation or flight operations. MODE 1090 Pro is an optional subscription. It renews automatically unless canceled at least 24 hours before the end of the current period. Manage or cancel it in your App Store account settings. Privacy: https://mode1090.com/privacy/ Terms of Use: https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Support: https://mode1090.com/support
Screenshots
Verdict
The clearest difference is iOS requirement: MODE 1090 at 15.0 against SKYGATE's 17.0. On price, update cadence, ads and in-app purchases there is nothing between them.
Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS
Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month and MODE 1090 sells 2 in-app purchases, starting at $4.99 per month. Whichever you choose, the download price is not the number that matters.
Both ship on a similar rhythm, roughly weekly. The most recent releases landed on November 3, 2026 and October 29, 2026 respectively.
| Parameter | SKYGATE | MODE 1090 |
|---|---|---|
| Price | Free | Free |
| Positive reviews | 100.0% of reviews | — |
| Update frequency | Weekly | Weekly |
| Ads | No | No |
| In-app purchases | Yes | Yes |
| Monetization | Freemium | — |
| Devices | iPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better | iPhone, iPad, iPod, Apple TV, Apple Watch |
| Requires iOS | 17.0 | 15.0 — better |
| Further details — not scored | ||
| Size | 28 MB | 201 MB |
| Age rating | 4+ | 4+ |
| Developer | HUGO ANATOLE PAUL MORICEAU | Alexander Stolte |
In-app purchases
SKYGATE
- SKYGATE Premium Monthly3 Days trial$2.991 Month
- SKYGATE Premium Weekly$4.997 Days
- SKYGATE Premium Annual3 Days trial$19.991 Year
MODE 1090
- Monthly$4.991 Month
- Annually$34.991 Year









