Comparison

LT Flights vs Vylet

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

LT Flights

Features
Read full description

All your flight details in one place. LT Flights helps you plan a trip around a specific flight: search for airline tickets, save flight details, follow available updates, and keep everything important close at hand. SEARCH FOR AIRLINE TICKETS Compare available offers from airlines and travel agencies. Choose the option that suits you and continue to the seller’s website to book. The purchase is completed with the selected airline or travel agency. KEEP YOUR FLIGHT UNDER CONTROL Add a flight by number and date or enter the details manually. The route, airline, departure time, and arrival time are organized in one clear flight card. Check available flight information such as status, updated times, terminal, and boarding gate. Enable notifications to hear about important changes. If no data is available, open the airport website directly from the flight card. DOCUMENTS OFFLINE Add tickets, boarding passes, visas, insurance policies, and other documents. Files stay on your device and remain available in airplane mode or when the internet connection is poor. REMINDERS AND NOTES Set reminders for online check-in, leaving for the airport, and checking documents. Choose your local time, departure-airport time, or arrival-airport time. Add notes so you do not forget your passport, travel medicine kit, or other essentials. PLAN AHEAD Add flights to your system calendar. View airport information, estimate the distance, and open directions from the flight card. Read short travel stories and useful tips right in the app. LT Flights is a LUNTANTRAVEL app for people who fly often. Free, with no registration required—simply add your first flight.

About

Vylet

Features
Read full description

Flight delayed by three hours or more, cancelled at short notice, or were you bumped from an overbooked flight? Under European rules (Regulation (EC) No 261/2004) the airline may owe you €250, €400 or €600 in cash — on top of any refund. Vylet tells you in seconds whether you're entitled and how much. HOW IT WORKS • Pick where you flew from and to — over 3,000 airports worldwide, works offline • Tell us what happened: delay, cancellation or denied boarding • Answer two or three quick questions — only the ones that matter for your case • See the amount right away, together with the reasoning behind it WHAT VYLET CHECKS • Whether your flight is covered: departures from the EU, EEA, Switzerland and the UK on any airline, and flights into Europe on European airlines • The amount by distance: €250 up to 1,500 km, €400 up to 3,500 km or within Europe, €600 beyond that • The three-hour threshold for delays, measured at your final destination • How much notice you got of a cancellation, and whether a replacement flight halves the amount • Extraordinary circumstances such as bad weather or air traffic control strikes — the only lawful reason for an airline to refuse • Flights from the UK under UK261, with amounts in pounds LIVE DEPARTURE BOARDS Departures and arrivals for Oslo, Bergen, Trondheim, Stavanger, Tromsø and six more Norwegian airports, plus Hamburg, updated every few minutes. Tap a delayed or cancelled flight to check your compensation with the route and delay already filled in, or follow it to get an alert when its status changes. PAST FLIGHTS COUNT TOO You can usually claim for flights from the past few years — the time limit depends on the country. FILE A CLAIM If you're entitled, one tap takes you to a partner claims service that deals with the airline for you. Such services usually work on a no-win, no-fee basis and share part of their commission with us — that's how checking your flight in Vylet stays free. ALSO IN VYLET Live departure boards for Russian airports, with an automatic mass-delay detector and a guide to passenger rights under Russian rules. Vylet is not a law firm and does not give legal advice. The final decision rests with the airline or a court.

Screenshots

LT Flights4 screens
Vylet4 screens

Verdict

The call

LT Flights and Vylet are too close to call on the numbers: across 6 compared parameters — price, update cadence, ads and in-app purchases among them — neither pulls far enough ahead to decide it. What separates them is feature set and interface, not measurable difference.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. Neither carries in-app purchases, so what you see is what you pay.

UpkeepUpdate frequency

LT Flights ships an update every 4 days, Vylet every 2 days. The most recent releases landed on October 25, 2026 and October 26, 2026 respectively.

ScorecardNo meaningful differences
LT Flights versus Vylet: the parameters behind the verdict, then further details
ParameterLT FlightsVylet
PriceFreeFree
Update frequencyEvery 4 daysEvery 2 days — better
AdsYesYes
In-app purchasesNoNo
DevicesiPhone, iPad — betteriPhone
Requires iOS16.216.0 — better
Further details — not scored
Size177 MB32 MB
Age rating4+4+
DeveloperIgor RepinIvan Beschetnikov

In-app purchases

None

LT Flights

No in-app purchases

None

Vylet

No in-app purchases

Questions

Is LT Flights free?
LT Flights is free to download, with no in-app purchases.
Is Vylet free?
Vylet is free to download, with no in-app purchases.
Do LT Flights or Vylet have ads?
Both LT Flights and Vylet show ads.
Which is updated more often, LT Flights or Vylet?
LT Flights ships an update every 4 days, and Vylet every 2 days. Most recently, LT Flights was updated on October 25, 2026 and Vylet on October 26, 2026.

Other comparisons