
Lever Frame
Three ages of the signal box
0 ratings
Free
In-App Purchases
Rating summary
About
Somewhere between the timetable and the train there's a signaller, and tonight it's you.
Lever Frame puts you in charge of a railway signal box and takes you through three ages of how the job was done. Every box has its own track, its own trains and its own way of working, and each one you master opens the next.
It starts at Ashby, a country station with a goods loop and a six-lever frame. Trains keep coming, and each one needs the road set before it reaches you: pull the levers in the right order, points first, then the home signal, then the starter. Every lever carries a little picture of what it works, a semaphore arm that lifts with it or a fork of track that shows which way the points lie. Pull the yellow distant last and the driver gets a clear run; forget it and the driver eases right off, ready to stop. The interlocking is real, so a lever that would be unsafe simply won't come over. Every train wears a badge that tells you what it is, fast, freight or stopping, and where a stopper has to call, and that station's platform glows until it has.
At Hollin Cross the levers give way to a 1960s panel: points switches, signal buttons, a train describer and three lines to keep busy, with stopping trains to put into the right platform and expresses to keep on the fast line. Rush hour there is something else. So is the single line beyond it, where one train at a time has to be threaded between two stations.
Kirkby Junction brings you up to date. On the workstation you tap a signal on the screen, then tap where the route should end, and the points set themselves. That leaves you free to think about the order of trains, about which freight to stand in the goods loop, and about what to do when a set of points fails or a signal sticks at red and a driver has to be talked past it.
Then the traffic starts coming both ways. At Wrenfield, Down trains run in from the right while Up trains run out, and anything for the Branch has to cross the Down line on the flat, so one train waits while the other goes. Saltmoor is a single line with one passing loop: a train can only go on to the single line once there's a loop track free at the far end, so you decide who waits and who runs. Ravensby Junction puts the two together, with a choice of Down platforms and a Branch that is one track worked both ways. For the hardest shifts there's Bank Holiday, with three failures on the busiest day of the year, and the Moor Line, one track end to end with two places to pass and heavy freight that won't be hurried.
When the shift ends you'll see it written up in the train register, one line per train: booked, actual and whether it ran to time. Up to three stars for each box, a best score to beat on every box's Game Center leaderboard, achievements to earn, and a fresh shift every day that everyone plays the same.
The first three boxes, Ashby, Fenby and Hollin Cross, are free. One purchase, the Full Timetable, opens the other eight and the daily shift for good.
All the sounds, from a train's horn to the clunk of a lever landing in its notch, are made inside the game. There are no adverts and nothing to sign up for, and nothing about you leaves your device.
Show more
+1
What's New in Lever Frame
1.0
November 16, 2026
1
Subscriptions & In-App Purchases
$1.99
The Full Timetable
Eight more boxes, Expert and the daily shift.







