Comparison

Oracle Primavera Cloud vs DroneDeploy Ground App

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

Oracle Primavera Cloud

Update project progress and monitor performance from anywhere. Access project details offline, update assigned tasks, and view project files. Gain insights into project health and deadlines with powerful overviews.

Highlights
  • Offline project access
  • On-site progress updates
  • Project performance overviews
  • Visual work plan management
  • Project file browsing and saving
  • Communication with task performers
Read full description

Use the Oracle Primavera Cloud app to update progress and monitor the health and performance of your projects. Oracle Primavera Cloud supports offline access and provides the following capabilities: • Access multiple projects while offline. • Provide on-site progress updates for your assigned work on projects, including tasks and activities. • Powerful overviews quickly provide insight into the performance of your projects and highlight missed and upcoming deadlines. • Visually manage work plans and communicate with task performers from all partner companies. • Browse and view project files, and save them for access while offline. Note: For full functionality, a current license and connection to Oracle Primavera Cloud are required. The app includes a demo mode that enables you to evaluate the app without a license or connection.

About

DroneDeploy Ground App

Capture ground-level data for construction and industrial projects. Log in, connect a 360 camera or use your device's camera to take photos, and sync to the platform for processing and analysis. Collaborate, inspect, and integrate with industry tools.

Highlights
  • 360° panorama and walkthrough capture
  • Standard photo capture
  • Sync to DroneDeploy platform
  • Team collaboration
  • Project data inspection and annotation
  • Integration with industry tools
Features
Read full description

The DroneDeploy Ground app empowers businesses in construction, engineering, and other industrial sectors to efficiently document and manage ground-level data, providing a powerful complement to drone-based insights. DroneDeploy Ground is the next-generation ground capture app for project teams, including former StructionSite users. Note: This app is intended for enterprise users with an active DroneDeploy license. Simplify Ground-Level Data Capture in 3 Easy Steps: 1. Log in to your DroneDeploy account (trial or active license required). 2. Connect your 360 camera to capture 360° panoramas and 360° Walkthroughs, or use your device's camera to capture standard photos. 3. Sync your captures to the DroneDeploy platform for processing, sharing, and analysis. Once uploaded, your captures are processed and accessible through the DroneDeploy platform, where you can: • Collaborate with your team and stakeholders. • Inspect, compare, and annotate project data over time. • Integrate seamlessly with leading industry tools like Procore, Autodesk Build, and more. Supported Hardware: • Insta360 X5 • Insta360 X4 • Insta360 RS 1-inch • Ricoh Theta X • Ricoh Theta Z1 Visit our website for a complete list of supported hardware and to learn more about the DroneDeploy ecosystem. For Business and Professional Use: The DroneDeploy Ground app is a free companion tool for licensed DroneDeploy enterprise customers. A valid enterprise account is required for uploading and processing captures

Screenshots

Oracle Primavera Cloud4 screens
DroneDeploy Ground App4 screens

Verdict

The call

The clearest difference is rating: DroneDeploy Ground App at 4.5 against Oracle Primavera Cloud's 3.3. DroneDeploy Ground App also leads on review sentiment (41% vs 0%) and update cadence (weekly vs every 2 months). On price, ads, in-app purchases and monetization model there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. Neither carries in-app purchases, so what you see is what you pay.

ReceptionRating · Positive reviews · Number of ratings

DroneDeploy Ground App holds the better App Store score, 4.5 against 3.3. That said, the two scores are not equally well evidenced: DroneDeploy Ground App has 37 ratings behind it against 4, so its average is the more settled of the two. Written reviews point the same way: 0% of Oracle Primavera Cloud's written reviews are positive against 41% of DroneDeploy Ground App's.

UpkeepUpdate frequency

Oracle Primavera Cloud ships an update every 2 months, DroneDeploy Ground App weekly. The most recent releases landed on November 4, 2026 and November 3, 2026 respectively.

Scorecard5 real differences · 5 level
Oracle Primavera Cloud versus DroneDeploy Ground App: the parameters behind the verdict, then further details
ParameterOracle Primavera CloudDroneDeploy Ground App
PriceFreeFree
Rating3.3 (4 ratings)4.5 (37 ratings) — better
Positive reviews0.0% of reviews41.4% of reviews — better
Number of ratings437 — better
Update frequencyEvery 2 monthsWeekly — better
AdsNoNo
In-app purchasesNoNo
MonetizationFreeFree
DevicesiPhone, iPadiPhone, iPad
Requires iOS18.016.4 — better
Further details — not scored
Size31 MB435 MB
Age rating4+4+
DeveloperOracle America, Inc.DroneDeploy

Customer experience

Oracle Primavera Cloud

All ratings4 ratings
Positive50.0%
Neutral25.0%
Negative25.0%
Written reviews2 reviews
Positive0.0%
Neutral50.0%
Negative50.0%

DroneDeploy Ground App

All ratings35 ratings
Positive88.6%
Neutral0.0%
Negative11.4%
Written reviews58 reviews
Positive41.4%
Neutral5.2%
Negative53.4%

Bugs and requests

Oracle Primavera Cloud

Not enough reviews yet to summarise bugs or requests.

DroneDeploy Ground App

Reported bugs

68 issues
  • Spam email
  • Freezes, lags, slow
  • Constantly have to fight to log in
  • Processing walks takes forever and is unreliable
  • Fails to process a walk
Show 63 more
  • Extremely hard to login into
  • Lots of errors
  • Reset password and still 50/50 shot
  • Massive pain to get back into the app
  • Have to redownload the app
  • Glichy
  • App doesn’t work on the new iPhone
  • Won’t even open
  • Very difficult if not impossible to use at times
  • Won’t select the correct icon
  • Can’t zoom in anymore
  • Selection something approx an inch up and left from where clicking
  • App constantly crashes
  • Won’t load selected items
  • Still feels like a beta version
  • App often crashes and becomes unusable
  • Disconnects from the camera
  • States universal link is not recognized
  • Does not upload
  • Footage is sped up and unusable
  • Only works on apple devices
  • Does not stay connected to camera
  • Cannot get any walks to stay active
  • Camera has disconnected from the app automatically
  • Cannot sync walks unless iPad is connected to WiFi
  • Drawings need more than two supported file formats
  • Need to upload drawing in advance
  • No photos of the drawing supported
  • New interface is glitchy and does not work well
  • Crashes constantly
  • Will not let you upload photos
  • Does not allow you to sync
  • Error message saying there’s no space on the device
  • Force closes
  • Never works
  • Fails constantly
  • Can’t login half the time
  • App crashes a lot
  • Crosshairs misalign all the time
  • When clicking an existing pin, crosshairs put you way below the pin and create a new pin
  • Very high chance of having to do a 360 walk again because of an error
  • Difficult to upload in the background
  • App needs to be open to upload
  • Takes a long time to upload
  • App and website are always crashing
  • App doesn’t stay connected to the camera
  • Icons don’t show up after you’ve taken photos
  • App crashes frequently
  • Takes 30 + seconds between photos
  • Takes a good 10+ seconds to take your next photo
  • Persistent bugs
  • Frustrating user interface
  • Logging points takes almost twice as long
  • Deleting images or removing false points is unnecessarily complicated
  • App freezes while a photo uploads
  • Missing folders on ground app
  • Cannot upload any photos because folders are missing
  • Issues with the app not uploading data
  • Occasionally completely loses photos
  • Cannot delete anything on the app
  • Have to delete the app to redownload
  • Won’t save good uploads
  • Not optimized for iPad

Requested features

8 requests
  • New update for Insta X4 air compatibility
  • Android app support
  • Downloadable PDF with active 360 photos
  • Support for Insta360 One R camera
  • iPad optimization
Show 3 more
  • Ability to add pins to drawings in the app without internet
  • Support for more than two drawing file formats
  • Background uploads

In-app purchases

None

Oracle Primavera Cloud

No in-app purchases

None

DroneDeploy Ground App

No in-app purchases

Questions

Is Oracle Primavera Cloud free?
Oracle Primavera Cloud is free to download, with no in-app purchases.
Is DroneDeploy Ground App free?
DroneDeploy Ground App is free to download, with no in-app purchases.
Which has better reviews, Oracle Primavera Cloud or DroneDeploy Ground App?
DroneDeploy Ground App is rated higher. Oracle Primavera Cloud averages 3.3 out of 5 from 4 ratings, while DroneDeploy Ground App averages 4.5 from 37 ratings.
Do Oracle Primavera Cloud or DroneDeploy Ground App have ads?
Neither Oracle Primavera Cloud nor DroneDeploy Ground App shows ads.
Which is updated more often, Oracle Primavera Cloud or DroneDeploy Ground App?
Oracle Primavera Cloud ships an update every 2 months, and DroneDeploy Ground App weekly. Most recently, Oracle Primavera Cloud was updated on November 4, 2026 and DroneDeploy Ground App on November 3, 2026.

Other comparisons