Comparison

Volo vs SKYGATE

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

Volo

This app provides real-time flight status, including delays, gate changes, and departure/arrival information. It offers airport performance data and smart notifications to keep travelers informed. Designed for ease of use, it focuses on delivering essential travel intelligence without clutter.

Highlights
  • Real-time flight status
  • Live departure and arrival info
  • Gate change alerts
  • Airport on-time performance
  • Connection risk surfacing
  • Smart notifications
Features
Read full description

Volo is the flight tracker built for how people actually travel — together. Whether you're coordinating a group trip, keeping tabs on a connecting flight, or checking if your airport is running on time, Volo gives you the real-time intelligence you need in a clean, intuitive experience. ▶ REAL-TIME FLIGHT TRACKING - Live flight status with departure, arrival, and gate info - Smart filters by airline, status, and route - Flight Connector logic surfaces connection risks before they happen ▶ AIRPORT PERFORMANCE CARDS - On-time performance data for your airport. - See delay trends by airline and route at a glance - Know what you're walking into before you even leave home ▶ SMART NOTIFICATIONS - Timely alerts for gate changes, delays, and departures - Notifications designed to inform, not overwhelm ▶ CLEAN & FOCUSED - Built for passengers first — no clutter, no noise - Fast search by flight number or route - Designed for one-handed use on the go Volo is free to download. Premium features available for free.

About

SKYGATE

Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.

Highlights
  • Automatic compensation claim
  • Real-time flight tracking
  • Live gate and delay alerts
  • AI-powered passenger rights
  • Predictive delay scoring
  • Family and team flight sharing
Features
Read full description

Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.

Screenshots

Volo4 screens
SKYGATE4 screens

Verdict

The call

The clearest difference is in-app purchases: Volo at none against SKYGATE's 3. Volo also leads on iOS requirement (15.1 vs 17.0). SKYGATE's advantage is update cadence (weekly vs every 5 weeks) and device support (6 vs 3). On price, ads and monetization model there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month. Volo asks for nothing beyond the download.

UpkeepUpdate frequency

Volo ships an update every 5 weeks, SKYGATE weekly. Both last shipped on November 15, 2026.

Scorecard4 real differences · 6 level
Volo versus SKYGATE: the parameters behind the verdict, then further details
ParameterVoloSKYGATE
PriceFreeFree
Rating5.0 (1 ratings) — better—
Positive reviews—100.0% of reviews
Number of ratings1 — better—
Update frequencyEvery 5 weeksWeekly — better
AdsNoNo
In-app purchasesNo — betterYes
MonetizationFree with in-app purchasesFreemium
DevicesiPhone, iPad, iPodiPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better
Requires iOS15.1 — better17.0
Further details — not scored
Size61 MB28 MB
Age rating4+4+
DeveloperDarpan PatelHUGO ANATOLE PAUL MORICEAU

Customer experience

Volo

All ratings2 ratings
Positive100.0%
Neutral0.0%
Negative0.0%

SKYGATE

Written reviews2 reviews
Positive100.0%
Neutral0.0%
Negative0.0%

In-app purchases

None

Volo

No in-app purchases

3 purchases

SKYGATE

Subscriptions3
  • SKYGATE Premium Monthly3 Days trial$2.991 Month
  • SKYGATE Premium Weekly$4.997 Days
  • SKYGATE Premium Annual3 Days trial$19.991 Year

Questions

Is Volo free?
Volo is free to download, with no in-app purchases.
Is SKYGATE free?
SKYGATE is free to download, with in-app purchases available.
Do Volo or SKYGATE have ads?
Neither Volo nor SKYGATE shows ads.
Which is updated more often, Volo or SKYGATE?
Volo ships an update every 5 weeks, and SKYGATE weekly. Most recently, Volo was updated on November 15, 2026 and SKYGATE on November 15, 2026.

Other comparisons