Flight Log & Tracker vs SKYGATE
Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.
Flight Log & Tracker
This app automatically logs your flights, creating a visual travel diary with live status updates and detailed statistics. It offers automatic import from your email and manual entry options, with a premium subscription for enhanced features.
- Automatic flight import from email
- Manual flight entry by number or route
- Live flight status and delays
- Interactive world map of routes
- Travel statistics (distance, time, countries)
- Calendar integration
- Multi-language support
Read full descriptionHide full description
Bordy turns your flights into a beautiful travel log. Add any flight by number or route — or connect your inbox and Bordy adds them automatically. Bordy builds your flight history: live status, the route drawn on a world map, and stats that add up. WHY BORDY - Automatic flight import from your email inbox - Add flights in seconds — by flight number or by route - Live flight status, delays and timing - Every route drawn on an interactive map - Reminders: delays, time to leave for the airport, and more - Travel stats: distance flown, time in the air, countries, airports, airlines and aircraft - Add flights straight to your calendar - Available in English, Русский, Español, Deutsch and Français BORDY PRO Unlock the full picture with a subscription: - Extended statistics and breakdowns - Extra color themes - Alternate app icons Sign in is quick and private with Sign in with Apple — no passwords. Start logging your journeys with Bordy. Terms of Use: https://bordy.space/terms Privacy Policy: https://bordy.space/privacy
SKYGATE
Read full descriptionHide full description
Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.
Screenshots
Verdict
The clearest difference is update cadence: SKYGATE at weekly against Flight Log & Tracker's every 2 weeks. SKYGATE also leads on device support (6 vs 2). Flight Log & Tracker's advantage is iOS requirement (15.1 vs 17.0). On price, ads and in-app purchases there is nothing between them.
Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS
Both are free to download. Flight Log & Tracker sells 3 in-app purchases, starting at $1.99 per 7 days and SKYGATE sells 2 in-app purchases, starting at $2.99 per month. Whichever you choose, the download price is not the number that matters.
Flight Log & Tracker ships an update every 2 weeks, SKYGATE weekly. The most recent releases landed on October 28, 2026 and October 31, 2026 respectively.
| Parameter | Flight Log & Tracker | SKYGATE |
|---|---|---|
| Price | Free | Free |
| Positive reviews | 100.0% of reviews | — |
| Update frequency | Every 2 weeks | Weekly — better |
| Ads | No | No |
| In-app purchases | Yes | Yes |
| Monetization | Freemium | — |
| Devices | iPhone, iPod | iPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better |
| Requires iOS | 15.1 — better | 17.0 |
| Further details — not scored | ||
| Size | 67 MB | 28 MB |
| Age rating | 4+ | 4+ |
| Developer | Dmitry Yunkov | HUGO ANATOLE PAUL MORICEAU |
In-app purchases
Flight Log & Tracker
- Pro Weekly$1.997 Days
- One Year$39.991 Year
- Lifetime$250.00
SKYGATE
- SKYGATE Premium Monthly3 Days trial$2.991 Month
- SKYGATE Premium Annual3 Days trial$19.991 Year









