AMA vs SKYGATE
Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.
AMA
Read full descriptionHide full description
Discover the ultimate aviation companion with Avia Master. This iOS app lets you scan boarding-pass QR and barcodes to instantly access flight details. Effortlessly search and track flights live on a map to view their position, altitude, and speed in real-time. Dive into a comprehensive exploration of U.S. airports with detailed contextual information and enrich your aviation knowledge through our extensive aircraft encyclopedia. Designed for iPhone users, Avia Master serves as your all-in-one solution for flight monitoring and aviation insights. Key Features: - Boarding-pass scanner: Quickly retrieve flight information by scanning QR and barcodes. - Live flight tracker: View real-time positions, altitudes, and speeds of flights on an interactive map. - U.S. airport browsing: Access detailed information about airports, including terminals and facilities. - Aircraft encyclopedia: Explore extensive data on various aircraft models and specifications. - User-friendly interface: Easily navigate through features with our intuitive design. Whether you're a frequent flyer or an aviation enthusiast, Avia Master provides everything you need to stay informed and connected with the world of aviation. Download now and elevate your travel experience.
SKYGATE
Read full descriptionHide full description
Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.
Screenshots
Verdict
The clearest difference is in-app purchases: AMA at none against SKYGATE's 2. SKYGATE's advantage is device support (6 vs 1). On price, ads and iOS requirement there is nothing between them.
Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS
Both are free to download. SKYGATE sells 2 in-app purchases, starting at $2.99 per month. AMA asks for nothing beyond the download.
| Parameter | AMA | SKYGATE |
|---|---|---|
| Price | Free | Free |
| Update frequency | — | Weekly |
| Ads | No | No |
| In-app purchases | No — better | Yes |
| Devices | iPhone | iPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better |
| Requires iOS | 18 | 17.0 — better |
| Further details — not scored | ||
| Size | 11 MB | 28 MB |
| Age rating | 4+ | 4+ |
| Developer | TN KOWAH LTD | HUGO ANATOLE PAUL MORICEAU |
In-app purchases
AMA
No in-app purchases
SKYGATE
- SKYGATE Premium Monthly3 Days trial$2.991 Month
- SKYGATE Premium Annual3 Days trial$19.991 Year









