SKYGATE vs Flyover Alerts
Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.
SKYGATE
Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.
- Automatic compensation claim
- Real-time flight tracking
- Live gate and delay alerts
- AI-powered passenger rights
- Predictive delay scoring
- Family and team flight sharing
Read full descriptionHide full description
Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.
Flyover Alerts
Receive timely alerts on your phone when large aircraft are about to fly overhead. Customize alert settings and track planes in real-time on a live map. Set up multiple locations for personalized notifications.
- Heads-up airplane flyover alerts
- Customizable alert parameters
- Real-time live map of aircraft
- Support for multiple saved locations
- Location tracking for on-the-go alerts
- Detailed aircraft information
Read full descriptionHide full description
Your phone buzzes a few minutes before a giant airplane passes over you, and tells you exactly where to look. That's the whole app. Close it and we'll find you. WHAT AN ALERT LOOKS LIKE Airbus A380-800 Look southeast at 6:52PM — 7 min, 29° up A direction, a countdown, and how far up to tilt your head. Step outside and it's there. HOW YOU SET IT UP Drop a pin where you watch from — the back yard, the office window, a park bench. Name it. That's setup. There is no account to make, no email to hand over, and no password to forget. WHAT WAKES YOU We only buzz you for the real thing. Out of the box that means widebody jets passing within 14 nautical miles of your pin, above 30,000 feet, three to eight minutes before they get there, in daylight. Every one of those is yours to change, along with quiet hours and a cap on how many alerts a day you'll take. FOLLOW MY PHONE Turn it on and your spot travels with you, so a road trip or a hotel room gets the same heads-up your back yard does. We only ever keep where you are now — never where you've been. THE LIVE MAP Open the app to see what's in the sky around you right now, drawn from public ADS-B data. Tap an aircraft for its type, altitude, speed and heading. UP TO THREE SPOTS Home, work, and the cabin. Each one gets its own alerts. Flyover Alerts is a subscription: $7.99/month or $39.99/year, auto-renewing, cancel anytime in Settings. Terms of Use: https://flyoveralerts.com/terms Privacy Policy: https://flyoveralerts.com/privacy
Screenshots
Verdict
The clearest difference is monetization model: SKYGATE at freemium against Flyover Alerts's subscription. SKYGATE also leads on device support (6 vs 2). Flyover Alerts's advantage is iOS requirement (15.1 vs 17.0). On price, ads and in-app purchases there is nothing between them.
Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS
Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month and Flyover Alerts sells 2 in-app purchases, starting at $7.99 per month. Whichever you choose, the download price is not the number that matters.
| Parameter | SKYGATE | Flyover Alerts |
|---|---|---|
| Price | Free | Free |
| Rating | — | 5.0 (2 ratings) — better |
| Positive reviews | 100.0% of reviews | — |
| Number of ratings | — | 2 — better |
| Update frequency | Weekly | — |
| Ads | No | No |
| In-app purchases | Yes | Yes |
| Monetization | Freemium — better | Subscription |
| Devices | iPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — better | iPhone, iPod |
| Requires iOS | 17.0 | 15.1 — better |
| Further details — not scored | ||
| Size | 28 MB | 44 MB |
| Age rating | 4+ | 4+ |
| Developer | HUGO ANATOLE PAUL MORICEAU | JOHN MICHAEL REGER |
In-app purchases
SKYGATE
- SKYGATE Premium Monthly3 Days trial$2.991 Month
- SKYGATE Premium Weekly$4.997 Days
- SKYGATE Premium Annual3 Days trial$19.991 Year
Flyover Alerts
- Monthly$7.991 Month
- Annual$39.991 Year









