Comparison

SKYGATE vs Wingman

Price, ratings, monetisation and update history for both apps, side by side — with what reviewers say about each.

Head to head
About

SKYGATE

Automatically claim compensation for delayed or cancelled flights. Track flights in real-time with gate alerts and live map updates. Get AI-powered assistance with your rights and rebooking options.

Highlights
  • Automatic compensation claim
  • Real-time flight tracking
  • Live gate and delay alerts
  • AI-powered passenger rights
  • Predictive delay scoring
  • Family and team flight sharing
Features
Read full description

Get up to €600 back when your flight is delayed or cancelled — automatically. Start your free 3-day trial. SKYGATE is the flight tracker that fights for you — for travelers who refuse to be caught off guard. REAL-TIME TRACKING - Live gate changes, delays and cancellations, updated continuously - Full timeline: pushback, takeoff, cruise, landing, baggage - Live plane position on the map with altitude and speed - Dynamic Island and Live Activity: your gate at a glance AI RESCUE - YOUR RIGHTS, INSTANTLY When a flight is delayed 3 hours or cancelled, SKYGATE estimates your EU261 or DOT compensation (up to 600 EUR), drafts a ready-to-send complaint email, and surfaces your rebooking and care rights. FAMILY & TEAM (SkyGroup) Share a live flight board with up to 6 people. Perfect for parents tracking children or assistants tracking executives. Instant iCloud sync. PREDICTIVE DELAY SCORE On-device intelligence scores every flight before you fly, from route, carrier, aircraft and weather. PREMIUM Free: track 1 active flight. Premium (3-day free trial): unlimited flights, AI Rescue, SkyGroup, all widgets and priority refresh. Supports iPhone and iPad, Lock Screen widgets, Dynamic Island and StandBy.

About

Wingman

Features
Read full description

Wingman turns your Apple Watch into a live aircraft awareness companion... LIVE RADAR See nearby aircraft relative to your current location, including callsign, altitude, speed, direction and distance where available. WHAT'S THAT PLANE? Quickly identify the aircraft most likely to be in view. TRACK MY FLIGHT Search for a flight number and follow available route, status, altitude, speed, distance and ETA information. FAST JET ALERTS Receive available military and fast-jet notifications when traffic data indicates a relevant aircraft nearby. Wingman relies on third-party ADS-B and aviation data. Coverage and aircraft details vary by location and receiver availability. Wingman is for informational use only and is not a navigation, air traffic control or collision-avoidance system.

Screenshots

SKYGATE4 screens

Verdict

The call

The clearest difference is in-app purchases: Wingman at none against SKYGATE's 3. SKYGATE's advantage is device support (6 vs 3). On price, ads and iOS requirement there is nothing between them.

Scored on Price · Rating · Positive reviews · Number of ratings · Update frequency · Ads · In-app purchases · Monetization · Best chart rank · Devices · Requires iOS

CostPrice · In-app purchases · Ads · Monetization

Both are free to download. SKYGATE sells 3 in-app purchases, starting at $2.99 per month. Wingman asks for nothing beyond the download.

Scorecard2 real differences · 6 level
SKYGATE versus Wingman: the parameters behind the verdict, then further details
ParameterSKYGATEWingman
PriceFreeFree
Positive reviews100.0% of reviews—
Update frequencyWeekly—
AdsNoNo
In-app purchasesYesNo — better
MonetizationFreemium—
DevicesiPhone, iPad, Mac, Apple TV, Apple Watch, Vision Pro — betteriPhone, iPad, Apple Watch
Requires iOS17.0 — better18.0
Further details — not scored
Size28 MB11 MB
Age rating4+4+
DeveloperHUGO ANATOLE PAUL MORICEAUAaron Weatherston

In-app purchases

3 purchases

SKYGATE

Subscriptions3
  • SKYGATE Premium Monthly3 Days trial$2.991 Month
  • SKYGATE Premium Weekly$4.997 Days
  • SKYGATE Premium Annual3 Days trial$19.991 Year
None

Wingman

No in-app purchases

Questions

Is SKYGATE free?
SKYGATE is free to download, with in-app purchases available.
Is Wingman free?
Wingman is free to download, with no in-app purchases.
Do SKYGATE or Wingman have ads?
Neither SKYGATE nor Wingman shows ads.

Other comparisons